摘要:
矿山生产技术的数字化、信息化和智能化发展,伴生着缺少数据标准、数据难以共享、缺少流程规范和存在系统壁垒等问题。通过对矿山生产技术现状进行分析,提出了构建一个业务数据标准化、工作流程规范化的矿山开采全生命周期业务管理平台,为矿山生产技术和管理提供统一的数字化作业环境。平台研发成果成功应用于新疆某地下铜矿,包含矿山地质、测量和采矿等133个业务数据的标准化和39项业务流程的规范化。平台上线后业务数据通过数据中心统一存取,业务审批从人工推进转变为流程驱动,业务处理前的数据准备时间极大缩短,实现了矿山生产技术数据的高效流转和共享,提高了技术管理和团队协作效率。矿山生产技术协同平台的研发与应用对矿山全业务流程协同、大数据分析和智能管控系统建设等方面的研究与落地均具有重要的借鉴意义。
中图分类号:
Baram A,Fogel E,Halperin D,al et,2018.Exact Minkowski sums of polygons with holes[J].Computational Geometry:Theory and Applications,73:46-56. . | |
Bi Lin,Wang Jinmiao,2019.Construction target,task and method of digital mine[J].Metal Mine,38(6):148-156. | |
Bi Lin,Zhao Hui,Jia Mingtao,2016.Database-oriented storage based on LMDB and linear octree for massive block model[J].Transactions of Nonferrous Metals Society of China,26(9):2462-2468. | |
Cao Yingli,2019.Application of 3D laser scanning technology in mine survey[J].World Nonferrous Metals,(21):14-15. | |
Chen Xin,Wang Liguan,2016.3D laser equidistant scanning method from single station and efficient modeling algorithm for mine goaf [J].Journal of China University of Mining & Technology,45(4):836-842. | |
Duan Ping,Li Jia,Li Haikun,al et,2020.3D modeling method of UAV image point cloud and ground laser point cloud registration[J].Engineering of Surveying and Mapping,29(4):44-47. | |
Gu Q H,Lu C W,Li F B,al et,2008.Monitoring dispatch information system of trucks and shovels in an open pit based on GIS/GPS/GPRS[J].Journal of China University of Mining & Technology,(2):288-292. | |
James H,Ajith K P,Jennifer S,2019.A building information modelling approach to the alignment of organisational objectives to Asset Information Requirements[J].Automation in Construction,104(3):14-26. | |
Kong K H,Chong W T,Koh V L,2019.Human behaviour-dependent and variable-flow-reversible mechanical ventilation system design in an underground parking facility[J].Indoor and Built Environment,28(10):1324-1340. | |
Liu Siquan,2019.Application of GPS-RTK technology in mine survey[J].World Nonferrous Metals,(20):56-58. | |
Liu Zhanning,Song Yuchen,Meng Haidong,al et,2018.The influences of block size and estimation methods on the valuation of ore grade[J].Mining Research and Development,38(6):89-93. | |
Luo Yao,Mo Wenbo,Yan Zike,2020.Research on fusion technology of tile photogrammetry and BIM 3D modeling[J].Journal of Geomatics,45(4):40-45,126. | |
Pan Y,Liang C J,Dong L,2019.A two-stage model for an urban underground container transportation plan problem[J].Computers & Industrial Engineering,138:106113. | |
Pu Hao,Song Zhanfeng,Zhan Zhenyan,2005.3D-modelling for roads based on constrained Delaunay triangulation[J].Journal of Huazhong University of Science and Technology (Nature Science Edition),(6):111-113. | |
Radrigo M,Enrico Z,Fredy K,2013.Availability-based simulation and optimization modeling framework for open-pit mine truck allocation under dynamic constrains[J].International Journal of Mining Science and Technology,23:113-119. | |
Sun Jiakun,Wang Pingfan,Fang Huijuan,2020.Design and implementation of the production logistics collaboration platform for a compressor enterprise[J].Journal of Shandong Jianzhu University,35(4):94-102. | |
Sun Ka,Weng Zhengping,Zhang Zhiting,al et,2007.3D roadway modeling method based on restrained triangulation[J].Mining Research and Development,(5):64-71. | |
Wang Liguan,Chen Xin,2016.Advancing technologies for digital mine[J].The Chinese Journal of Nonferrous Metals,26(8):1693-1710. | |
Wang M,Liu K,Yang G L,al et,2017.Three-dimensional slope stability analysis using laser scanning and numerical simulation[J].Geomatics,Natural Hazards and Risk,8(2):129-136. | |
Wang Rongbang,Tian Zhongjie,Li Qingyao,2012.Application of intersection surveying in surface coal mine based on total station[J].Science & Technology Information,(3):44-46. | |
Wang Weicai,Peng Chengshan,Yang Chenhui,al et,2020.Monitoring accuracy estimation and verification analysis of automatic total station[J].Construction & Design for Engineering,(12):237-240. | |
Yang Zhen,Guo Changfang,Wang Jingyi,al et,2019.Research on construction of intelligent mine driven by data[J].China Coal,45(11):41-48. | |
Zeng Xiangkai,2020.Accuracy analysis of mine topographic survey based on lidar mapping technology[J].World Nonferrous Metals,(1):31-32. | |
Zhao Z P,Cheng C T,Jin X Y,al et,2020.A MILP model for hydro unit commitment with irregular vibration zones based on the constrained Delaunay triangulation method[J].International Journal of Electrical Power and Energy Systems,123:106241. | |
毕林,王晋淼,2019.数字矿山建设目标、任务与方法[J].金属矿山,38(6):148-156. | |
毕林,赵辉,贾明涛,2016.面向数据库特征的基于LMDB与线性八叉树海量块段模型存储技术[J].有色金属学报,26(9):2462-2468. | |
曹英莉,2019.三维激光扫描技术在矿山测量中的应用[J].世界有色金属,(21):14-15. | |
陈鑫,王李管,2016.采空区单站激光等距扫描与高效三维重建方法[J].中国矿业大学学报,45(4):836-842. | |
段平,李佳,李海昆,等,2020.无人机影像点云与地面激光点云配准的三维建模方法[J].测绘工程,9(4):44-47. | |
刘思铨,2019.GPS-RTK技术在矿山测量中的应用探析[J].世界有色金属,(20):56-58. | |
刘占宁,宋宇辰,孟海东,等,2018.块体尺寸和估值方法对矿石品位估值的影响[J].矿业研究与开发,38(6):89-93. | |
罗瑶,莫文波,颜紫科,2020.倾斜摄影测量与BIM三维建模集成技术的研究与应用[J].测绘地理信息,45(4):40-45,126. | |
蒲浩,宋占峰,詹振炎,2005.基于约束Delaunay三角剖分的道路三维建模方法[J].华中科技大学学报(自然科学版),(6):111-113. | |
孙家坤,王平凡,房慧娟,2020.压缩机企业生产物流协同平台的设计与实现[J].山东建筑大学学报,35(4):94-102. | |
孙卡,翁正平,张志庭,等,2007.基于带约束三角剖分的三维巷道建模方法[J].矿业研究与开发,(5):64-71. | |
王李管,陈鑫,2016.数字矿山技术进展[J].中国有色金属学报,26(8):1693-1710. | |
王荣榜,田忠杰,李庆尧,2012.基于全站仪的交会法测量在露天矿山的应用[J].露天采矿技术,(3):44-46. | |
王伟才,彭成山,杨晨辉,等,2020.自动全站仪的监测精度估算及验证分析[J].工程建设与设计,(12):237-240. | |
杨真,郭昌放,王静宜,等,2019.由数据驱动的智慧矿山建设研究[J].中国煤炭,45(11):41-48. | |
曾祥凯,2020.基于激光雷达测绘技术在矿山地形测量中的精度分析[J].世界有色金属,(1):31-32. |
[1] | 董文明,谭期仁. 湖山铀矿生产技术协同平台研发及应用[J]. 黄金科学技术, 2022, 30(6): 968-977. |
[2] | 谭正华,李国泰,文阳. 基于JSON的数字采矿协同技术研究及应用[J]. 黄金科学技术, 2021, 29(5): 719-728. |
|