黄金科学技术 ›› 2023, Vol. 31 ›› Issue (4): 669-679.doi: 10.11872/j.issn.1005-2518.2023.04.023
Shuang HUANG1(),Mingtao JIA1,Fang LU2()
摘要:
针对地下矿山空间受限、设备资源有限以及生产任务重的特点,从相邻工序时间间隔最短及生产总时间最短的角度,构建了预控顶中深孔分段空场嗣后充填采矿法的生产计划优化模型,并采用启发式算法加速的遗传算法求解该模型。以赞比亚某铜矿的实际数据为例,对启发式遗传算法和普通遗传算法求出的染色体适应度进行比较分析。结果表明:相比普通遗传算法启发式遗传算法的求解收敛速度更快,经优化后矿山设备平均利用率为64.8%,平均出矿量为3 631.19 t/d,既能满足开采需求,又能有效缩短作业时间间隔,保证作业安全要求。该算法能够快速有效地解决井下多设备协调问题。
中图分类号:
Ahmadi M R, Shahabi R S,2018.Cutoff grade optimization in open pit mines using genetic algorithm[J].Resources Policy,55:184-191. | |
Anna G, Michael L, Hakan S,et al,2014.Development of a Markov model for production performance optimization.Application for semi-automatic and manual LHD machines in underground mines[J].International Journal of Mining Reclamation and Environment,28(5):342-355. | |
Åstrand M, Johansson M, Zanarini A,2020.Underground mine scheduling of mobile machines using Constraint Programming and Large Neighborhood Search[J].Computers and Operations Research,123:1-13. | |
Cai Min, Wang Yan, Ji Zhicheng,2021.Hybrid particle swarm optimization for solving fuzzy flexible job-shop scheduling problem[J].Journal of Nanjing University of Science and Technology,45(3):352-360. | |
Cheng R W, Gen M, Tsujimura Y,1999.A tutorial survey of job-shop scheduling problems using genetic algorithms:Part II.hybrid genetic search strategies[J].Computers &Industrial Engineering,37(1/2):51-55. | |
Feng Yangyang,2013.Optimization model of vehicle arrangement based on multi-objective programming[J].Electronic Design Engineering,21(10):21-23. | |
Fu Xuan, Huang Linqi, Chen Jiangzhan,et al,2022.Meeting the challenge of high geothermal ground temperature environment in deep mining—Research on geothermal ground temperature simulation platform of rock true triaxial testing machine[J].Gold Science and Technology,30(1):72-84. | |
Hou J, Li G Q, Wang H,et al,2020.Genetic algorithm to simultaneously optimise stope sequencing and equipment dispatching in underground short-term mine planning under time uncertainty[J].International Journal of Mining,Reclamation and Environment,34(5):307-325. | |
Khan A, Niemann-Delius C,2015.Application of particle swarm optimization to the open pit mine scheduling problem[C]// Proceedings of the 12th International Symposium Continuous Surface Mining-Aachen 2014.Berlin:Springer International Publishing. | |
Li Guoqing, Hou Jie, Hu Nailian,2018.Integrated optimization model for production and equipment dispatching in underground mines[J].Chinese Journal of Engineering,40(9):1050-1057. | |
Li Guoqing, Li Bao, Hu Nailian,et al,2017.Optimization model of mining operation scheduling for underground metal mines[J].Chinese Journal of Engineering,39(3):342-348. | |
Li J Q, Duan P Y, Cao J D,et al,2018.A hybrid Pareto-based tabu search for the distributed flexible job shop scheduling problem with E/T criteria[J].IEEE Access,6:58883-58897. | |
Li Ning, Ye Haiwang, Wu Hao,et al,2017.Ore blending for mine production based on hybrid particle swarm optimization algorithm[J].Mining and Metallurgical Engineering,37(5):126-130. | |
Li Rui, Hu Nailian, Li Guoqing,et al,2017.Optimization of mining operation plan based on multi-objective 0-1 programming[J].Metal Mine,46(2):102-108. | |
Liu Xiaohui, Zeng Xiantao, Tan Wei,2019.Optimization and application of pre-controlling roof and sublevel open-stope mining with subsequent filling method[J].China Mining Magazine,28(3):87-92. | |
Matamoros M E V, Dimitrakopoulos R,2016.Stochastic short-term mine production schedule accounting for fleet allocation,operational considerations and blending restrictions[J].European Journal of Operational Research,255(3):911-921. | |
Pathak P, Samanta B,2022.A genetic algorithm-based approach for optimizing short-term production schedules of multi-mine mineral value chains[J].Mining Metallurgy and Exploration,39(4):1403-1427. | |
Ren Haibing, Wang Sihua,2005.Automatic adjusting method of plan of mining-excavation relay in the mine[J].Journal of Liaoning Technical University,(6):811-814. | |
Song Jiewei, Rong Gang,2003.Study of uncertainty problem in vehicles scheduling[J].Journal of Zhejiang University(Engineering Science),(2):117-122. | |
Sun Xiaoyu, Deng Penghong, Zhao Ming,2016.Integrated optimization model of multi-period open-pit mine production scheduling[J].Journal of Northeastern University(Natural Science),37(10):1460-1464. | |
Toledo A A T, Marques D M, Costa J F C L,et al,2022.Short-term mine scheduling targeting stationary grades[J].REM-International Engineering Journal,75(1):73-82. | |
Upadhyay S P, Askari-Nasab H,2018.Simulation and optimization approach for uncertainty- based short- term planning in open pit mines[J].International Journal of Mining Science and Technology,28(2):153-166. | |
Wang Ling, Zheng Dazhong,2001.Advances in job shop scheduling based on genetic algorithm[J].Control and Decision,(Supp.1):641-646. | |
Wang Shaofeng, Li Xibing,2021.Cutting characteristic and non-explosive mechanized rock-breakage practice of deep hard rock[J].Gold Science and Technology,29(5):629-636. | |
Wu Huijiang, Li Jianxiang,2005.Open-pit mine product planning:The current problems and strategies[J].Metal Mine,40(4):4-6,42. | |
Yu Jian, Huang Xingyi, Wu Dongxu,et al,2005.Theory and technology on trackless mining of gentle dip multi-strata ores of medium size[J].Journal of Central South University(Science and Technology),(6):1107-1111. | |
Yu S, Ding C, Zhu K,2011.A hybrid GA-TS algorithm for open vehicle routing optimization of coal mines material[J].Expert Systems with Applications,38(8):10568-10573. | |
傅璇,黄麟淇,陈江湛,等,2022.迎接深部开采高地温环境的挑战——岩石真三轴试验机地温模拟平台研究[J].黄金科学技术,30(1):72-84. | |
李国清,侯杰,胡乃联,2018.地下矿山生产接续与设备调度集成优化模型[J].工程科学学报,40(9):1050-1057. | |
李国清,李宝,胡乃联,等,2017.地下金属矿山采掘作业计划优化模型[J].工程科学学报,39(3):342-348. | |
李宁,叶海旺,吴浩,等,2017.基于混合粒子群优化算法的矿山生产配矿[J].矿冶工程,37(5):126-130. | |
李瑞,胡乃联,李国清,等,2017.基于多目标0-1规划的采掘作业计划优化[J].金属矿山,46(2):102-108. | |
刘晓辉,曾宪涛,谭伟,2019.预控顶分段嗣后充填采矿法的优化及应用实践[J].中国矿业,28(3):87-92. | |
任海兵,王思华,2005.矿井采掘接替计划自动调整方法[J].辽宁工程技术大学学报,(6):811-814. | |
宋洁蔚,荣冈,2003.运输调度中不确定性问题的研究[J].浙江大学学报(工学版),(2):117-122. | |
孙效玉,邓鹏宏,赵明,2016.多时段露天矿生产计划整体优化模型[J].东北大学学报(自然科学版),37(10):1460-1464. | |
王凌,郑大钟,2001.基于遗传算法的Job Shop调度研究进展[J].控制与决策,(增1):641-646. | |
王少锋,李夕兵,2021.深部硬岩可切割性及非爆机械化破岩实践[J].黄金科学技术,29(5):629-636. | |
吴会江,李建祥,2005.露天矿生产计划的现状、问题与对策[J].金属矿山,40(4):4-6,42. | |
余健,黄兴益,吴东旭,等,2005.缓倾斜中厚矿体机械化采矿理论与技术[J].中南大学学报(自然科学版),(6):1107-1111. |
[1] | 张泽群, 钟文, 杨华泽, 周伶杰, 林圣杰, 毛基腾, 赵奎. 分段空场嗣后充填法人工矿柱多源信息融合稳定性评价模型[J]. 黄金科学技术, 2024, 32(5): 894-904. |
[2] | 郭良银,蒋万飞,宋召法,刘晓光,张金超. 新城金矿阶段空场嗣后充填法开采大直径深孔切槽爆破方法[J]. 黄金科学技术, 2022, 30(4): 585-593. |
[3] | 谢饶青, 陈建宏, 肖文丰. 基于NPCA-GA-BP神经网络的采场稳定性预测方法[J]. 黄金科学技术, 2022, 30(2): 272-281. |
[4] | 赵兴东,曾楠,陈玉民,魏慧,王成龙,侯成录,杜云龙,范纯超. 三山岛金矿井下无人开采区域中深孔落矿嗣后充填连续采矿工艺设计[J]. 黄金科学技术, 2021, 29(2): 200-207. |
[5] | 公凡波,毕林. 露天矿电铲铲装移动轨迹规划研究[J]. 黄金科学技术, 2021, 29(1): 43-52. |
[6] | 王猛, 史秀志, 张舒. 面向产能优化的地下金属矿山安全保障条件评价研究[J]. 黄金科学技术, 2020, 28(5): 753-760. |
[7] | 许瑞, 侯奎奎, 王玺, 刘兴全, 李夕兵. 基于核主成分分析与SVM的岩爆烈度组合预测模型[J]. 黄金科学技术, 2020, 28(4): 575-584. |
[8] | 苏怀斌, 张钦礼, 张德明, 曾长根, 朱晓江. 穰家垅银矿大规模充填采矿采场结构参数优化研究[J]. 黄金科学技术, 2020, 28(4): 550-557. |
[9] | 代转,罗周全,秦亚光,文磊,丁春胜,董喆喆. 地下金属矿山广义安全管理模型构建及评价[J]. 黄金科学技术, 2019, 27(6): 920-930. |
[10] | 肖文丰,陈建宏,陈毅,王喜梅. 基于神经网络与遗传算法的多目标充填料浆配比优化[J]. 黄金科学技术, 2019, 27(4): 581-588. |
[11] | 刘志祥,刘奕然,兰明. 矿井涌水量预测的PCA-GA-ELM模型及应用[J]. 黄金科学技术, 2017, 25(1): 61-67. |
[12] | 尹土兵,王品,张鸣鲁. 基于AHP及模糊综合评判的地下金属矿山安全分析与评价[J]. 黄金科学技术, 2015, 23(3): 60-66. |
[13] | 叶培. 一种新的量子遗传算法在阳山金矿GPS卫星信号去噪处理中的应用探讨[J]. 黄金科学技术, 2015, 23(2): 83-87. |
[14] | 于常先,何顺斌,杨尚欢,黄维. 中深孔分段落矿嗣后充填采矿实践[J]. 黄金科学技术, 2014, 22(4): 85-88. |
[15] | 孙旭. 格尔珂金矿资源综合开发利用方案[J]. J4, 2003, 11(5): 28-32. |
|