采选技术与矿山管理

无底柱后退式竖向分条分段充填采矿法研究

  • 马云庆 ,
  • 王瑞星 ,
  • 何顺斌 ,
  • 王辉 ,
  • 于常先 ,
  • 邱云胜
展开
  • 山东黄金矿业(莱州)有限公司三山岛金矿,山东  莱州   261442
马云庆(1963-),男,山东高密人,高级工程师,从事矿山采矿技术设计和管理工作.190442098@qq.com

收稿日期: 2014-05-20

  修回日期: 2014-06-15

  网络出版日期: 2014-12-24

Study on the Method of Backward Vertical Striping Sublevel Filling Mining without Sill Pillar

  • MA Yunqing ,
  • WANG Ruixing ,
  • HE Shunbin ,
  • WANG Hui ,
  • YU Changxian ,
  • QIU Yunsheng
Expand
  • Sanshandao Gold Mine,Shandong Gold Mining (Laizhou) Co.,Ltd.,Laizhou   261442,Shandong,China

Received date: 2014-05-20

  Revised date: 2014-06-15

  Online published: 2014-12-24

摘要

结合三山岛金矿现行采矿方法应用情况对无底柱后退式竖向分条分段充填采矿法从方案的提出、理论依据及研究目的进行了说明,重点对采准工程布置方式,采场生产组织形式,采场施工技术等进行了介绍。通过与矿山现行盘区采矿法进行综合指标对比研究和总结,得出该方法具有以下优点:分段回采,大幅降低采准工程费用;中深孔落矿,降低凿岩爆破成本;倾斜分条回采,实现了定点出矿,既提高了出矿效率,又避免了充填体溃塌造成的二次贫化;竖向分条回采,能有效控制采场顶板及上盘冒落;后退回采,两翼回风,改善采场安全及通风条件等。加上天井施工以切代掘等多项创新技术的应用,解决了困扰矿山多年的中深孔采矿天井上掘问题。该方法设计合理,施工技术易于掌握,具有极高的推广应用价值。

本文引用格式

马云庆 , 王瑞星 , 何顺斌 , 王辉 , 于常先 , 邱云胜 . 无底柱后退式竖向分条分段充填采矿法研究[J]. 黄金科学技术, 2014 , 22(4) : 67 -71 . DOI: 10.11872/j.issn.1005-2518.2014.04.067

Abstract

Combined with the application situation of current mining method in Sanshandao gold deposit,this paper has carried a brief description on the scheme proposed,the theoretical basis and the research purpose for the method of backward vertical striping sublevel filling mining without sill pillar,and also has focused on the introduction of mining engineering arrangement,stope production organization form,stope construction technology and so on.By comparatively studied and summarized the mining method indicators in the existing panels in mine area,some advantages have been derived for this method,such as the sublevel stoping dramatically reducing the quasi project cost,the medium-length hole ore blast reducing the cost of drilling and blasting,the tilt striping stoping realized the fixed-point out of mine,which not only improved the efficiency of the out of mine,but also avoided the filling body collapse caused by secondary dilution.The vertical slitting stoping,effectively controlled the caving of stope roof and upper plate.The back stoping and the two wings return air,improved stope safety and ventilation,etc.With the application of a number of innovative technologies,for example patio construction and to cut the generation of digging,the problem of the patio up-dig of medium-length hole was solved which troubled the mine many years.In short,the method is reasonable designed and its construction technology is easy to grasp.It has a great value in popularization and application.

参考文献

[1] 解世俊.金属矿床地下开采[M].北京:冶金工业出版社,1986.
[2] 黄胜生.国内外缓倾斜中厚矿体采矿方法现状[J].矿业研究与开发,2001,21(4):21-24.
[3] 钟义旒.金属矿床开采[M].北京:冶金工业出版社,1998.
[4] 况世华,何丽华.缓倾斜极薄矿脉开采新方法研究[J].云南冶金,2009,38(1):10-14.
[5] 韦章能.安庆铜矿缓倾斜薄矿体采矿工艺研究[J].有色金属(矿山部分),2006,58(3):10-11.
[6] 古德生,李夕兵.现代金属矿床开采科学技术[M].北京:冶金工业出版社,2006:10-35.
[7] 于润沧.采矿工程师手册(下)[M].北京:冶金工业出版社,2009:21-30.
[8] 《采矿设计手册》编委会.《采矿设计手册》[M].北京:中国建筑工程出版社,1987.

文章导航

/