Automatic Sampling Method of Blasting Boundary Lines and Automatic Upda-ting Method of Bench Top and Bottom Lines Based on Blasting Hole Layout
Received date: 2022-08-19
Revised date: 2022-10-21
Online published: 2023-01-06
露天矿山开采现状三维模型是露天矿山数字化、信息化和智能化建设的基础,为矿山精细化生产计划编制、爆破设计和卡车动态调度等提供模型依据。结合矿山生产日常测量的炮孔坐标信息,提出基于炮孔布局和爆破参数的爆区边界点自动采样方法,并利用 -shape法自动创建复杂爆区边界线,进而研究复杂爆区边界线与坡顶底线的空间分布关系,提出坡顶底线自动更新算法,结合地形线约束Delaunay构建DTM,可实现重构露天矿山开采现状三维模型。现场试验结果表明:基于炮孔布局自动采样爆破边界线及自动更新露天矿山坡顶底线效率高,更新耗时由4 h减少至1 min。
陈鑫 . 基于炮孔布局的爆区边界线自动采样及坡顶底线自动更新方法[J]. 黄金科学技术, 2022 , 30(6) : 978 -985 . DOI: 10.11872/j.issn.1005-2518.2022.06.104
Open pit mine current surface model is the foundation of digital,information and intelligent construction,which provides model for planning,blast designing and truck dispatching.With the progress of production,the 3D model of the current status of open-pit mining has been in flux.The mine needs to be equipped with special surveying and technical personnel to frequently measure and model the current status of open-pit mining.Combining with the blasting hole coordinates,blasting boundary point automatic sampling method was proposed based on blasting hole layout and blasting parameters.Then using -shape to create complex blasting area boundary lines.Spatial distribution relation between blasting area boundary lines and bench lines was researched,and automatic updating method of open pit mine bench lines was proposed.DTM was constructed by topographic line constrained Delaunay.Field test results show that automatic sampling method of blasting boundary and updating method of bench top and bottom lines is efficient.Time-consuming of surface model updating is decreased from 4 h to 1 min.This method is also suitable for measuring the corner coordinates of blasting area or based on the trajectory coordinates of shovel hauling equipment.It provides technical means and reference value for automatic updating of 3D model of open-pit mining status with different technical conditions.
http://www.goldsci.ac.cn/article/2022/1005-2518/1005-2518-2022-30-6-978.shtml
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
曹英莉,2019.三维激光扫描技术在矿山测量中的应用[J].世界有色金属,(21):14-15.
|
陈鑫,王李管,2016.采空区单站激光等距扫描与高效三维重建方法[J].中国矿业大学学报,45(4):836-842.
|
陈志宏,2015.RTK测量技术在露天矿测量中的应用[J].矿业工程,13(6):59-60.
|
段平,李佳,李海昆,等,2020.无人机影像点云与地面激光点云配准的三维建模方法[J].测绘工程,29(4):44-47.
|
李金玲,王李管,陈鑫,2016.露天台阶爆破矿岩交界处损失贫化控制系统[J].黄金科学技术,24(3):14-20.
|
李金玲,王李管,陈鑫,2017.露天矿山复杂爆破网路起爆模拟及效果预测[J].黄金科学技术,25(4):87-92.
|
刘思铨,2019.GPS-RTK技术在矿山测量中的应用探析[J].世界有色金属,(20):56-58.
|
罗瑶,莫文波,颜紫科,2020.倾斜摄影测量与BIM三维建模集成技术的研究与应用[J].测绘地理信息,(4):40-45.
|
孟永东,徐卫亚,田斌,等,2009.基于带约束三角剖分的三维地质建模方法及应用[J].系统仿真学报,21(19):5985-5989.
|
蒲浩,宋占峰,詹振炎,2005.基于约束Delaunay三角剖分的道路三维建模方法[J].华中科技大学学报(自然科学版),(6):111-113.
|
孙卡,翁正平,张志庭,等,2007.基于带约束三角剖分的三维巷道建模方法[J].矿业研究与开发,(5):64-65,71.
|
谭金石,速云中,祖为国,2020.多旋翼无人机在露天矿区测绘中的应用[J].矿山测量,48(3):101-104,109.
|
涂鸿渐,王李管,陈鑫,等,2019.基于混合整数规划法的露天矿配矿品位控制[J].黄金科学技术,27(3):458-465.
|
王李管,宋华强,毕林,等,2017.基于目标规划的露天矿多元素配矿优化[J].东北大学学报(自然科学版),38(7):1031-1036.
|
王荣榜,田忠杰,李庆尧,2012.基于全站仪的交会法测量在露天矿山的应用[J].露天采矿技术,(3):44-46.
|
王伟才,彭成山,杨晨辉,等,2020.自动全站仪的监测精度估算及验证分析[J].工程建设与设计,(12):237-240.
|
韦小儒,2018.无人机倾斜摄影测量在露天矿山监测中的应用研究[J].世界有色金属,(7):21-22.
|
曾祥凯,2020.基于激光雷达测绘技术在矿山地形测量中的精度分析[J].世界有色金属,(1):31-32.
|
/
〈 |
|
〉 |