Comprehensive Evaluation of Green Mine Construction in Gold Industry Based on DPSIR Model
Received date: 2023-02-02
Revised date: 2023-04-08
Online published: 2023-09-20
针对当前绿色矿山评价过程中存在的主观因素影响较大的问题,以黄金行业为例,基于驱动力—压力—状态—影响—响应框架模型,从5个层面构建指标体系。结合主客观组合赋权法确定指标权重,引入TOPSIS和耦合协调度模型定量评价绿色矿山建设时空演化过程及子系统间的耦合协调性,分析得出影响企业绿色矿山建设的主要障碍因子,为企业绿色矿山建设改进提供对策建议。通过对陕西某金矿的实际案例分析,验证了模型的适用性。本研究系统整合了绿色矿山评价指标,完善并优化了绿色矿山建设评价方法,使评价结果更加公平可靠,为推进矿山可持续发展提供了有效途径。
杨玮 , 薛梦鸽 , 龙涛 , 邓莎 , 邓博 , 方楠 . 基于DPSIR模型的黄金行业绿色矿山建设综合评价研究[J]. 黄金科学技术, 2023 , 31(4) : 635 -645 . DOI: 10.11872/j.issn.1005-2518.2023.04.018
At present,the evaluation system and methods of green mine construction in the gold industry are not perfect.On the one hand,in most studies,when establishing the index system,the internal relations between indicators were ignored,and only the influencing factors related to green mine construction in general were listed.On the other hand,most of the models lack completeness when establishing the evaluation model, they only evaluate the construction results at a certain time point without showing the change trend of the construction process.Based on the framework model of driving forces,pressure,state,impact and response,the evaluation index system of green mines in gold industry was constructed to express the internal relationship between indicators more intuitively.In building the evaluation model,the subjective and objective combination weighting method was introduced so as to make the index weight meet the subjective expectations of the decision-makers and the objective judgment requirements of the inconsistency between the indicators.The TOPSIS coupling coordination model was introduced to quantitatively evaluate the space-time evolution process of green mine construction and the coupling coordination among subsystems,and the main obstacle factors affecting the green mine construction of enterprises were analyzed,providing guidance countermeasures for the improvement of green mine construction of enterprises.Through the analysis of an actual case of a gold mine in Shaanxi Province,it is concluded that the green mine construction of the general system of the mine and the coupling and coordination degree between the subsystems are steadily increasing,the construction of each subsystem is fluctuating.The industrial production capacity(C1),the energy consumption(C5),the mine environment(C9),and the mineral processing(C11) are the main obstacles in the construction process,which are consistent with the actual construction of the mine,and the applicability of the model is verified.The evaluation index system established in this paper clarifies the function mechanism of each index of green mine construction,which helps enterprises flexibly respond to a series of related factor changes caused by a certain index change.The established evaluation model improves the defect of subjective influence on the evaluation results in the traditional evaluation,highlights the internal connection and coordination between the evaluation indicators,makes the evaluation process and results more fair and reliable,and provides an effective way to promote the sustainable development of the gold industry mining industry.
null | Chen J, Jiskani I M, Jin L C,et al,2020.Evaluation and future framework of green mine construction in China based on the DPSIR model[J].Sustainable Environment Research,30(1):1-10. |
null | Chen J, Jiskani I M, Lin A,et al,2022.A hybrid decision model and case study for comprehensive evaluation of green mine construction level[J].Environment,Development and Sustainability,25(4):3823-3842. |
null | Fu Qiang, Han Bing, Hou Hanfang,et al,2017.Effect appraisal of standards for green mines based on DEA method[J].Standard Science,(8):43-46. |
null | Guan Xin,2016.Analyzing on green ecological mine construction in China[J].China Mining Magazine,25(6):72-74. |
null | Hao Meiying, Li Liang, Zhao Guannan,2018.Interpretation of green mine construction specification of gold industry in China[J].China Mining Magazine,27(8):80-84,87. |
null | Huang Jingjun, Ni Jiazeng, Song Yunfei,et al,2009.Discussion on the evaluation index system for green mine construction[J].Metal Mine,39(11):147-150. |
null | Jin Xueqiang, Zhao Zhenyu, Wang Xiaolong,et al,2020.Problems and suggestions on the long-term mechanism of green mine in China [J].China Manganese Industry,38(6):79-83. |
null | Lai Xiaoying,2013.Research on evaluation index and method of green mine construction[J].Resources Economization and Environmental Protection,(8):26. |
null | Li Xin,2017.Practice and exploration of green mine construction mode[J].Natural Resource Economics of China,30(4):22-25. |
null | Li Xingru, Zhou Chuanyuan, Zhao Qibin,et al,2023.Study on internationalization level and quality improvement of China’s green mine construction based on standards comparison[J].Mining Research and Development,43(4):224-232. |
null | Liang W Z, Zhao G Y, Luo S Z,2021.Sustainability evaluation for phosphorus mines using a hybrid multi-criteria decision making method[J].Environment,Development and Sustainability,23(8):12411-12433. |
null | Liu Liping, Hou Huali, Liu Jianfen,2015.Some suggestions for green mines construction and development in China[J].Natural Resource Economics of China,28(7):18-21,25. |
null | Liu Yiqing, Liang Yanru, Liu Nana,et al,2020.Study on evaluation index system of green mine construction based on high quality development perspective[J].Gold Science and Technology,28(2):176-187. |
null | Luo Dejiang, Wu Hao, He Su,et al,2021.Multiattribute evaluation method for green mines based on hesitant fuzzy TOPSIS[J].Multipurpose Utilization of Mineral Resources,(4):41-49. |
null | Lyu H M, Zhou W H, Shen S L,et al,2020.Inundation risk assessment of metro system using AHP and TFN-AHP in Shenzhen[J].Sustainable Cities and Society,56(C):102103. |
null | Ma Li,2019.Research on the Development Level Evaluation,Development Mode and Long-term Mechanism of Green Mines in China[D].Xuzhou:China University of Mining and Technology. |
null | Ma Ning, Hu Nailian, Li Guoqing,et al,2019.Evaluation of human-machine effectiveness of plateau mine based on fuzzy analytic hierarchy process[J].Gold Science and Technology,27(6):871-878. |
null | Mariam K, Mohammad A A,2021.DPSIR framework and sustainable approaches of brine management from seawater desalination plants in Qatar[J].Journal of Cleaner Production,319:128485. |
null | Ministry of Natural Resources of the People’s Republic of China,2018., Green mine construction specification of gold industry: [S].Beijing:Ministry of Natural Resources of the People’s Republic of China. |
null | Pan B H, Liu S R, Xie Z J,et al,2021.Evaluating operational features of three unconventional intersections under heavy traffic based on CRITIC Method[J].Sustainability,13(8):1-30. |
null | Peng Huanzhi, Zhou Guohua, Cui Shuqiang,et al,2022.Evaluation and obstacle factor identification of multifunctionality of land use in Xiangjiang River Basin[J]. Research of Soil and Water Conservation,29(4):308-315. |
null | Shi L Y, Han L W, Yang F M,et al,2019.The evolution of sustainable development theory:Types,goals,and research prospects[J].Sustainability,11(24):1-16. |
null | Si Xiang, Zhang Yinghong, Liu Li,et al,2020.Thoughts on the construction and development of green mine in China in the new era[J].China Mining Magazine,29(2):59-64. |
null | Song Ziling, Fan Junfu, Qi Wenhui,et al,2016.Study on the surface coal mine green mining technology and appraising index system[J].Journal of China Coal Society,41(Supp.2):350-358. |
null | Sun Yingxiang,2020.A summary and reflection on the research status of green mine construction in China [J].Natural Resource Economics of China,33(9):35-40,85. |
null | Xu M X, Hu W Q,2020.A research on coordination between economy,society and environment in China:A case study of Jiangsu[J].Journal of Cleaner Production,258(C):120641. |
null | Xu Xianfeng, Xing Pengfei, Wang Suihong,et al,2022.Rock mass quality evaluation and application based on game theory and G1-EW-TOPSIS method[J].Gold Science and Te-chnology,30(5):704-712. |
null | Zhang Xiaogang, Qin Xuming, Liu Yonghong,et al,2021.Comparison and analysis of national green mine evaluation index and directory in 2019 and 2020[J].Opencast Mining Technology,36(5):121-124. |
null | Zhang Yingliang, Zhang Xiongming,2019.A brief analysis of green mine construction[J].China Non-metallic Minerals Industry,(2):64-65,63. |
null | 付强,韩冰,侯韩芳,等,2017.基于DEA方法的绿色矿山标准效果评估[J].标准科学,(8):43-46. |
null | 关锌,2016.我国绿色矿山建设浅析[J].中国矿业,25(6):72-74. |
null | 郝美英,李亮,赵冠楠,2018.我国黄金行业绿色矿山建设规范解读[J].中国矿业,27(8):80-84,87. |
null | 黄敬军,倪嘉曾,宋云飞,等,2009.绿色矿山建设考评指标体系的探讨[J].金属矿山,39(11):147-150. |
null | 金学强,赵震宇,王小龙,等,2020.新形势下绿色矿山建设长效机制问题研究及建议[J].中国锰业,38(6):79-83. |
null | 赖小莹,2013.绿色矿山建设评价指标与方法研究[J].资源节约与环保,(8):26. |
null | 栗欣,2017.绿色矿山建设模式的实践与探索[J].中国国土资源经济,30(4):22-25. |
null | 李杏茹,禚传源,赵祺彬,等,2023.基于标准比较的我国绿色矿山建设国际化水平与质量提升[J].矿业研究与开发,43(4):224-232. |
null | 刘丽萍,侯华丽,刘建芬,2015.对我国绿色矿山建设与发展的思考[J].中国国土资源经济,28(7):18-21,25. |
null | 刘亦晴,梁雁茹,刘娜娜,等,2020.基于高质量发展视角的绿色矿山建设评价指标体系研究[J].黄金科学技术,28(2):176-187. |
null | 罗德江,吴昊,何苏,等,2021.基于犹豫模糊TOPSIS的绿色矿山多属性评价方法[J].矿产综合利用,(4):41-49. |
null | 马莉,2019.我国绿色矿山发展水平评价及发展模式与长效机制研究[D].徐州:中国矿业大学. |
null | 马宁,胡乃联,李国清,等,2019.基于模糊层次分析法的高原矿井人机功效评价[J].黄金科学技术,27(6):871-878. |
null | 彭焕智,周国华,崔树强,等,2022.湘江流域土地利用多功能性评价及障碍因子识别[J].水土保持研究,29(4):308-315. |
null | 司芗,张应红,刘立,等,2020.新时代我国绿色矿山建设与发展的思考[J].中国矿业,29(2):59-64. |
null | 宋子岭,范军富,祁文辉,等,2016.露天煤矿绿色开采技术与评价指标体系研究[J].煤炭学报,41(增2):350-358. |
null | 孙映祥,2020.我国绿色矿山建设研究现状综述与思考[J].中国国土资源经济,33(9):35-40,85. |
null | 徐先锋,邢鹏飞,王岁红,等,2022.基于博弈论G1-EW-TOPSIS法的岩体质量评价和应用[J].黄金科学技术,30(5):704-712. |
null | 张小刚,秦绪明,刘永红,等,2021.2019年与2020年全国绿色矿山评价指标及名录对比分析[J].露天采矿技术,36(5):121-124. |
null | 张英亮,张兄明,2019.绿色矿山建设浅析[J].中国非金属矿工业导刊,(2):64-65,63. |
null | 中华人民共和国自然资源部,2018. 黄金行业绿色矿山建设规范: [S].北京:中华人民共和国自然资源部. |
/
〈 | 〉 |