img

Wechat

Adv. Search

Gold Science and Technology ›› 2016, Vol. 24 ›› Issue (4): 149-153.doi: 10.11872/j.issn.1005-2518.2016.04.149

Previous Articles     Next Articles

Study on the New Granulation Technology for Heap Leaching of Gold Ore

ZHANG Junjie,WANG Shuai,ZHANG Tianqi,LI Chao,LI Hongxu   

  1. School of Metallurgical and Ecological Engineering,University of Science and Technology Beijing,Beijing   100083,China
  • Received:2016-06-22 Revised:2016-07-17 Online:2016-08-28 Published:2016-11-17
  • Supported by:

    国家自然科学基金重点项目“铁铝复合矿中非铁元素提取工艺的基础研究”(编号:51234008)资助

Abstract:

Heap leaching is an effective method to deal with low grade gold ore.However,the ores containing much fines and clay are not suitable for direct heap leaching.In order to improve the permeability of ore heap,granulating and pretreatment are necessary.Granulating pretreatment can greatly enhance the gold leaching process and in most cases the leaching rate of the gold can also be improved.The issue researched the granulation of refractory gold ores on laboratory-scale condition.Rock ore and fine ore particle are mixed to granulation,using the cement,gypsum,bentonite,polyacrylamide and lime or several of the bond selection agents as binder.More groups of experiment were carried out,and eventually got the granulation adding appropriate cement,lime and polyacrylamide have better comprehensive performance,and the suitable grain size ratio of ore and powder mine is 1∶2,the most suitable water quality is 140~160 mL/kg.Due to the leaching strength of granulation adding gypsum binder is very poor,it’s not suitable for use as a binder.

Key words: refractory gold ores, granulation, adhesive, cement

CLC Number: 

  • TF831

[1] 邱竹贤.有色金属冶金[M].沈阳:东北大学出版社,2001.
[2] 宋庆双.金银提取冶金[M].北京:冶金工业出版社,2012.
[3] 周博敏,安丰玲.世界黄金生产现状及中国黄金工业发展的思考[J].黄金,2012,23(3):1-6.
[4] 王银宏.中国金矿资源现状与思考[J].国土与自然资源研究,2003(2):75-76.
[5] 罗栋, 王艳楠.我国金矿资源现状与找矿方向[J].资源与产业,2013,15(4):51-57.
[6] 康增奎.我国难处理金矿资源开发的现状与问题研究[J].资源与产业,2009,11(6):59-63.
[7] 刘苏宁.难浸金矿提金工艺的实验研究[D].西安:西安建筑科技大学,2010.
[8] 李俊萌.难处理金矿石预处理方法研究现状及其发展趋势[J].稀有金属,2003,27(4):478-481.
[9] 陈芳芳,张亦飞,薛光.黄金冶炼生产工艺现状及发展[J].中国有色冶金,2011,40(1):11-18.
[10] 刘汉钊.国内外难处理金矿焙烧氧化现状和前景[J].国外金属矿选矿,2005,42(7):5-10.
[11] 杨玮.复杂难处理金精矿提取及综合回收的基础研究与应用[D].长沙:中南大学,2011.
[12] 马正昌.黄金堆浸工艺的设计与应用[J].现代矿业,2013,29(9):141-142.
[13] 王菊香.浅谈含砷金矿提金前的预处理工艺及合理选择[J].工程建设,1997(6):23-26.
[14] 田树国.高砷金矿常温常压碱浸预处理工艺研究[D].赣州:江西理工大学,2009.
[15] 谢朝学,袁慧珍.浅论堆浸提金工艺过程[J].云南冶金,2006,35(4):16-20.
[16] 王成功,周世杰,张淑敏,等.碳质金矿石预氧化焙烧堆浸提金的研究[J].东北大学学报(自然科学版),2004,25(2):171-174.
[17] 童雄,钱鑫.国外强化金矿堆浸技术的最新进展[J].国外金属矿选矿,1996(5):1-3.

[1] Xu LU, Baohui TAN, Zhen GONG, Dengfeng SU, Ganggang ZHANG, Yingpeng HU. Research and Application of Cemented Filling Method to Sublevel Caving Method Under Soft Broken Rock Mass Condition [J]. Gold Science and Technology, 2024, 32(5): 905-915.
[2] Yuhang SHENG, Dianfei PEI, Zhaojun QI, Xiaodong JING. Influence of Particle Size Composition of Tailings on Rheological Characteristics and Strength of Cemented Tailings Backfill [J]. Gold Science and Technology, 2024, 32(4): 631-639.
[3] Yunlin YU, Kepeng HOU, Bajiu YANG, Yong CHENG, Taihong LU, Nannan ZHANG. Study on Pillar Mining Scheme of Gaofengshan Ore Section in Yunxi [J]. Gold Science and Technology, 2024, 32(3): 445-457.
[4] Long HAI, Rongtao BAO, Shilin TAN, Xianglong FANG. Experimental Study on the Mechanical Properties of Layered Tailing Sand Cemented Backfill and Optimization [J]. Gold Science and Technology, 2023, 31(5): 763-772.
[5] Huayou SU,Yongding WANG,Baohui TAN,Weiguo LONG,Ning YANG,Zhigui ZHANG,Xingming CHEN. Study on Induced Caving Mechanism and Development Process of Large Area Cemented Backfill [J]. Gold Science and Technology, 2022, 30(5): 713-723.
[6] Jiang GUO,Niming JIANG,Xin CHENG. Numerical Simulation Study on Shaft Construction Process of Water-rich Moraine Layer [J]. Gold Science and Technology, 2022, 30(5): 733-742.
[7] Yefan LIU,Ying SHI. Study on Dynamic Mechanical Characteristics of Phosphogypsum Cemented Filling Body [J]. Gold Science and Technology, 2022, 30(4): 574-584.
[8] Ensheng KANG,Zexi ZHAO,Haidong MENG. Displacement Prediction of Dump Slope Based on EEMD-HW-PSO-ELM Coupling Model [J]. Gold Science and Technology, 2022, 30(4): 594-602.
[9] Meidao ZHANG,Yunzhang RAO,Wenfeng XU,Wentao WANG. Orthogonal Experiment on Optimization of Filling Ratio of Full Tailings Paste [J]. Gold Science and Technology, 2021, 29(5): 740-748.
[10] Lulu XU,Qinli ZHANG,Ru FENG. Numerical Simulation of Backfill Strength Based on Optimization Results of Stope Structural Parameters [J]. Gold Science and Technology, 2021, 29(3): 421-432.
[11] Rendong HUANG,Zhe LI. Study on the Strength of Fine Tailings-graded Tailings Packing Body Based on Orthogonal Test [J]. Gold Science and Technology, 2021, 29(2): 256-265.
[12] Lijie GUO, Lei ZHANG, Wenchen LI. Progress and Prospects of the Preparation of Cementitious Materials Based on Nonferrous Metallurgical Slags [J]. Gold Science and Technology, 2020, 28(5): 621-636.
[13] Tingting ZHANG, Shiwei ZHI, Lijie GUO, Zhenlin WU, Junnan HAN. Research Progress of Resource Utilization of Copper-Nickel Smelting Slag [J]. Gold Science and Technology, 2020, 28(5): 637-645.
[14] Hua NA, Guocheng LÜ, Dan ZHANG, Lijuan WANG, Libing LIAO, Lijie GUO, Lingchang KONG, Lijuan WU, Jianhua BIAN. Research Progress of Typical Environmental Pollution in Polymetallic Mining Area and Its Filling and Gel Immobilization [J]. Gold Science and Technology, 2020, 28(5): 646-657.
[15] Zhiyuan YE, Qianqian WANG. Preparation and Performance of Aluminosilicate Based Solid Waste Cemen-titious Materials [J]. Gold Science and Technology, 2020, 28(5): 658-668.
Viewed
Full text


Abstract

Cited

  Shared   
  Discussed   
No Suggested Reading articles found!