img

Wechat

Adv. Search

Gold Science and Technology ›› 2017, Vol. 25 ›› Issue (3): 116-120.doi: 10.11872/j.issn.1005-2518.2017.03.116

Previous Articles     Next Articles

Application Practice of Increasing Production and Reducing Consumption in Grinding System of Dayingezhuang Gold Mine

XU Huaihao,LI Jinyou   

  1. Zhaojin Mining Industry Co.,Ltd.,Zhaoyuan    265400,Shandong,China
  • Received:2016-06-12 Revised:2017-01-11 Online:2017-06-30 Published:2017-09-11

Abstract:

Aiming at the problems of  low grinding production capacity,low efficiency of mill,low classigication efficiency of cyclone,high consumption of steel ball and energy,grinding research and industrial applications were carried out in Dayingezhuang gold mine,by using the technology of accurate ball loading and addition,and  a good effect of increasing production and reducing consumption was achieved.The results show that the production capacity of the mill increased by 5.01%,electricity consumption decreased by 7.88% and the grinding media consumption decreased by 6.84%.Mill efficiency increased by 9.16% and 10.45%,respectively.Cyclone classification efficiency has been increased by 4.94% and 4.07%,the mass transfer efficiency of cyclone classifier increased by 3.51% and 3.90% respectively.The -0.074 mm product of cyclone classification increased by 0.52%,-0.010 mm content reduced by 3.5%.Concentrate grade and recovery has been improved.The results indicated that the increasing production of mill has a remarkable economic benefit,so it has the value of popularization and application.

Key words: grinding efficiency, increasing production, reducing consumption, efficiency of mill, classification efficiency, technology of accurate ball loading and addition, Dayingenzhuang gold mine

CLC Number: 

  • TD853 

[1] Li Jinyou,Wang Shaolin,Xu Huaihao,et al.Application of auto- matic control of mineral processing in Dayingezhuang gold mine[J].Gold,2012,33(9):36-39 [李进友,王少林,徐怀浩,等.大尹格庄金矿选矿自动控制的应用[J].黄金,2012,33(9):36-39.]
[2] Lei Xiaoli,Li Jinquan,Xu Zhongmin,et al.Application of the technology of accurate ball loading and addition in con- centrating mill of Jinchiling gold mine[J].Gold Science and Technology,2015,23(6):87-91.[雷小莉,李金泉,徐忠敏,等.精确化装补球技术在金翅岭金矿选矿厂的应用[J].黄金科学技术,2015,23(6):87-90.]
[3] Duan Xixiang,Zhou Ping,Pan Xinchao.Accurate method for ball load and addition in mill[J].Nonferrous Metal,2004,56(3):75-78. [段希祥,周平,潘新潮.球磨机精确化装补球方法[J].有色金属,2004,56(3):75-78.]
[4] Guo Yongjie.Application of Precise Make-up Premium Ball Method in Non-standard Two Section of Ball Grinding Rubbing Flow[D].Kunming:Kunming Universtiy of Science and Technology,2009.[郭永杰.非标准两段球磨磨矿流程实施精确化装补球方法的应用研究[D].昆明:昆明理工大学,2009.]
[5] Luo Chunmei,Guo Yongjie,Duan Xixiang.Study on effect of accurate ball-load-addition method on dressing target[J].Mining and Metallurgy,2008,17(4):19-23.[罗春梅,郭永杰,段希祥.精确化装补球方法对选矿指标影响的研究[J].矿冶,2008,17(4):19-23.] 
[6] Pan Xinchao.Study of Precise Make-up Premium Ball Method and Its Application[D].Kunming:Kunming Universtiy of Science and Technology,2003.[潘新潮.精确化装补球方法及应用研究[D].昆明:昆明理工大学,2003.]
[7] Xiao Qingfei,Shi Guiming,Luo Chunmei,et al.Further impro- vement of mill capacity in Shizishan copper mine by applying accurate ball charging[J].Mining and Metallurgical Engi- neering,2008,28(6):32-34.[肖庆飞,石贵明,罗春梅,等.进一步提高狮子山铜矿磨机生产能力的研究[J].矿冶工程,2008,28(4):32-34.]
[8] Xiao Qingfei,Li Guihai,Shi Guiming,et al.Application of accurate ball loading and addition in Shizishan copper mine[J].Metal Mine,2007(12):68-71.[肖庆飞,李桂海,石贵明,等.精确化装补球法在狮子山铜矿的应用[J].金属矿山,2007(12):68-71.]
[9] Wang Taiping,Xiao Qingfei,Li Bo,et al.Application research of accurate ball loading and addition in Dongguashan copper mine[J].Journal of Kunming University of Science and Techno- logy(Natural Science Edition),2015,40(4):23-27.[汪太平,肖庆飞,李博,等.精确化装补球制度在冬瓜山铜矿的应用研究[J].昆明理工大学学报(自然科学版),2015,40(4):23-27.]
[10] Kang Huaibin,Xiao Qingfei,Qin Hongxun,et al. Study on the application of  accurate ball loading and addition in Dayingezhuang gold mine[J].Gold,2015,36(6):53-56.[康怀斌,肖庆飞,秦洪训,等.精确化装补球方法在大尹格庄金矿中的应用研究[J].黄金,2015,36(6):53-56.]
[11] Chang Fuqiang,Duan Dehua,Song Yan.The method of im- proving the grinding efficiency of ball mill in production[J].Morden Mining,2011(3):81-84.[常富强,段德华,宋龑.生产中提高球磨机磨矿效率的方法[J].现代矿业,2011(3):81-84.]
[12] Duan Xixiang.The Crushing and Grinding[M].Beijing:Metal- lurgical Industry Press,2006.[段希祥.碎矿与磨矿[M].北京:冶金工业出版社,2006.]

[1] XIE Minxiong,LI Zhengyao,LIN Shuyong,CHI Xiaopeng,QI Chuanduo. Research on the Technology Innovation and Application of Improving Performance of Grinding System in Concentrator  [J]. Gold Science and Technology, 2012, 20(6): 65-68.
Viewed
Full text


Abstract

Cited

  Shared   
  Discussed   
No Suggested Reading articles found!