Gold Science and Technology ›› 2017, Vol. 25 ›› Issue (4): 58-64.doi: 10.11872/j.issn.1005-2518.2017.04.058
Previous Articles Next Articles
JIA Mingtao,LV Qinghai,CHEN Xin,SONG Huaqiang
CLC Number:
[1] Wang Qing.Mining Science[M].Beijing:Metallurgical Industry Press,2007:344-394.[王青.采矿学[M].北京:冶金工业出版社,2007:344-394.] |
[1] | Zhenyang LI, Baogang ZHANG, Xin XIONG, Chengye YANG, Yuqi BAI. Research on PPV Prediction Model of Open-pit Mine Based on PSO-XGBoost [J]. Gold Science and Technology, 2024, 32(4): 620-630. |
[2] | Deyun ZHONG, Lixue WEN, Liguan WANG. Two-step Optimization Method for Airflow Control Based on Mixed Integer Programming [J]. Gold Science and Technology, 2024, 32(2): 356-365. |
[3] | Shuhong DAI, Zhanjun ZHANG, Kai LIU, Hao ZHENG, Qinglin SUN. Noise Reduction Method of Open-pit Blasting Vibration Signal Based on PEMD-MPE Algorithm [J]. Gold Science and Technology, 2024, 32(1): 82-90. |
[4] | Long HAI, Lixin FENG, Shilin TAN, Yongbo LV. Study on Reinforcement of Open-pit Mine Dump Slope by Root-Soil Composite [J]. Gold Science and Technology, 2023, 31(6): 911-918. |
[5] | Pengfei WANG,Lin BI,Liguan WANG. Research on Speed Planning of Unmanned Driving Mining Trucks in Open-pit Mines [J]. Gold Science and Technology, 2022, 30(3): 460-469. |
[6] | Fanbo GONG,Lin BI. Research on Trajectory Planning of Electric Shovel in Open-pit Mine [J]. Gold Science and Technology, 2021, 29(1): 43-52. |
[7] | Ensheng KANG, Haidong MENG, Zihao ZHAO, Tao HE. Investigation on Factors Affecting Slope Instability in Open-pit Mines Based on Geophysical Prospecting Technology [J]. Gold Science and Technology, 2020, 28(3): 363-371. |
[8] | Hongjian TU,Liguan WANG,Xin CHEN,Zhuli REN,Ju ZHANG. Ore Grade Control Blending in Open-pit Mine Based on Mixed Integer Programming [J]. Gold Science and Technology, 2019, 27(3): 458-465. |
[9] | YANG Mingcai, SHENG Jianlong, YE Zuyang, DONG Shu. Analysis of Sensitivity Factors of Open-pit Mine Slope Stability and Impact Based on FlAC3D [J]. Gold Science and Technology, 2018, 26(2): 179-186. |
[10] | REN Zhuli,WANG Liguan. Risk Analysis of Underground Mine Production Scheduling Based on Metal Price Uncertainty [J]. Gold Science and Technology, 2017, 25(6): 52-60. |
[11] | WEN Chao, GU Qing-Hua, FENG Ji-Yi. The Research of the Ore Mixing Management System in the Open-pit Mine Based on GIS [J]. J4, 2009, 17(2): 58-62. |
[12] | LIU Qiu-Qin, HUANG Guang-Qiu, GUO Jin-Ping. A genetic program ming method to autom atically identify the function of side-slope lateral displacem ent in open-pit mines [J]. J4, 2000, 8(2): 44-48. |
|