Numerical Simulation of Collapse Disaster Before and After Weakening of Thick and Hard Roof

Nao LV(),Haibo WANG()   

  1. School of Civil Engineering and Architecture,Anhui University of Science and Technology,Huainan 232001,Anhui,China
  • Received:2018-04-14 Revised:2018-07-10 Online:2019-04-30 Published:2019-04-30
  • Contact: Haibo WANG E-mail:519363133@qq.com;wanghb_aust@163.com

Abstract:

In view of the impact disaster caused by large area roof caving on mechanical equipment and workers in mining area,the related research was conducted relying on 210108 working face of Xinji No.2 Mine.According to the difference of block volume before and after roof weakening.A a three-dimensional calculation model of two kinds of caving bodies with the same height and width,coal seam,goaf and floor is established by using ANSYS/LS-DYNA finite element software.The calculation adopts Euler-Lagrange fluid-solid coupling algorithm.Rock and coal are described by Lagrange mesh and Lagrange element,air is described by ALE mesh and Euler element.The cloud map of hurricane velocity in goaf and roadway ,and the cloud map of effective stress in the bottom of coal seam in typical moment behind roof collapse are obtained by simulation under two kinds of calculation conditions.The variation rule of hurricane wind speed in roadway caused by collapse of different volume before and after roof weakening and the influence of impact load on coal seam in working face are analyzed.The results show that: For two kinds of condition,the attenuation law of hurricane velocity in goaf and roadway is basically the same,but the distribution characteristics of effective stress at the bottom of coal seam are different.From goaf to roadway entrance,hurricane speed tends to increase,and the wind speed increases sharply at roadway entrance,but the wind speed decreases with the increase of the distance between the location and the roadway entrance.With the increase of roof falling time,the wind speed in the roadway rises as a whole,but the attenuation and deceleration decay rate of the wind speed in the roadway decreases gradually,and the peak wind speed decreases logarithmically with the increase of the distance between the location and the roadway entrance.After roof weakening,the length of collapse body decreases,and hurricane wind speed decreases at different times.The maximum wind speed value ofin roadway entrance decreases from 298.62 m/s to 224.89 m/s,which decreases by 25%,and the reduction increases gradually with the increase of the distance to roadway entrance,which is 42% at 90 m.According to the fitting formula of the relationship between peak wind speed and distance,when the maximum allowable wind speed is 6 m/s,the influence range of Hhurricane after roof weakening decreases from 247 m to 158 m,which reduces by 36%.Large area of roof collapse causes stress concentration in coal seam of working face.After roof weakening,the stress distribution in coal seam of working face is more uniform,and the peak value of maximum effective stress decreases from 10 MPa before weakening to 4.3 MPa,which decreases by 57%.Controlling the cyclic step distance of roof weakening caving below 30 m can significantly reduce the impact range of hurricane and the impact load on the stability of coal seam in working face.

Key words: roof collapse, hurricane, impact load, wind velocity, distance, numerical simulation thick-hard strata, mine goaf

CLC Number: 

  • TD853

Fig.1

Side diagram of calculation model"

Fig.2

Calculation model of roof before and after weakening"

Table 1

Physical and mechanical parameters of rock"

岩石密度/(kg·m-3抗拉强度/MPa抗压强度/MPa弹性模量/GPa泊松比
顶板26952.6492.335.50.24
底板25172.753028.70.226

Table 2

Calculation parameters of coal and air"

材料密度/(kg·m-3杨氏模量/GPa泊松比屈服强度/MPaC0C1C2C3C4C5C6μ
煤体1 2705.080.2810--------
空气1.18---00000.40.401.745×10-5

Fig.3

Wind velocity cloud map of goaf and roadway at different times before roof weakening"

Fig.4

Wind velocity cloud map of goaf and roadway at different times after roof weakening"

Fig.5

Variation of wind velocity at different positions in roadway at different times before roof weakening"

Fig.6

Variation of wind velocity at different positions in roadway at different times after roof weakening"

Fig.7

Attenuation law of peak wind velocity in roadway before and after roof weakening"

Table 2

Peak velocity of wind at different distance from roadway entrance before and after roof weakening"

至巷道口距离/m未弱化风速峰值/(m·s-1弱化后风速峰值/(m·s-1
0298.62224.89
10216.98157.82
20169.92131.90
30147.89114.44
40133.0998.93
50117.9883.24
60100.8670.01
7092.6964.76
8082.7340.30
9061.3835.81

Fig.8

Von mises stress cloud map of coal seam bottom before and after roof weakening"

1 姜海军.浅埋煤层短壁开采关键层破断及控制研究[D].北京:中国矿业大学,2016.
JiangHaijun.Study on the Breaking and Control of Key Strata under Short-Wall Mining in Shallow Seam[D].Beijing:China University of Mining and Technology,2016.
2 KouameK J A,JiangF X,ZhuS T.Research on cause of dynamic disaster of deep mining cintrol in China and its further prevention application in Ivory coast[J].Geotechnical and Geological Engineering,2017,35(3):1141-1149.
3 WangH W,JiangY D,ZhaoY X,et al.Numerical investigation of the dynamic mechanical state of a coal pillar during Longwall mining panel extraction[J].Rcck Mechanics and Rock Engineering,2013,46(5):1211-1221.
4 宋选民,连清旺,邢平伟,等.采空区顶板大面积垮落的空气冲击灾害研究[J].煤炭科学技术,2009,37(4):1-4.
SongXuanmin,LianQingwang,XingPingwei,et al.Research on air bumping disaster induced by large roof falling in goaf [J].Coal Science and Technology,2009,37(4):1-4
5 王开,弓培林,张小强,等.复采工作面过冒顶区顶板断裂特征及控制研究[J].岩石力学与工程学报,2016,35(10):2080-2088.
WangKai,GongPeilin,ZhangXiaoqiang,et al.Characteristics and control of roof fracture in caving zone for residual coal mining face[J].Chinese Journal of Rock Mechanics and Engineering,2016,35(10):2080-2088.
6 王晓军,邓书强,李永欣,等.散体介质下水平矿柱顶板失稳控制研究[J].黄金科学技术,2016,24(2):76-82.
WangXiaojun,DengShuqiang,LiYongxin,et al.Research on instability control of horizontal pillar roof in granular medium[J].Gold Science and Technology,2016,24(2):76-82.
7 付玉平,宋选民,邢平伟,等.浅埋厚煤层大采高工作面顶板岩层断裂演化规律的模拟研究[J].煤炭学报,2012,37(3):366-371.
FuYuping,SongXuanmin,XingPingwei,et al.Study on simulation of caving and evolution law of roof strata of large mining height workface in shallow thick coal seam[J]. Journal of China Coal Society,2012,37(3):366-371.
8 刘洪磊,杨天鸿,张博华,等.西部煤层开采覆岩垮落及矿压显现影响因素研究[J].煤炭学报,2017,42(2):460-469.
LiuHonglei,YangTianhong,ZhangBohua,et al.Influence factors of overlying coal strata falling and mine pressure behaviors in western coal mines[J].Journal of China Coal Society,2017,42(2):460-469.
9 姜耀东,杨英明,马振乾,等.大面积巷式采空区覆岩破坏机理及上行开采可行性分析[J].煤炭学报,2016,41(4):801-807.
JiangYaodong,YangYingming,MaZhenqian,et al.Breakage mechanism of roof strata above widespread mined-out area with roadway mining method and feasibility analysis of upward mining[J].Journal of China Coal Society,2016,41(4):801-807.
10 何江,窦林名,巩思园,等.倾斜薄煤层切顶巷预裂顶板防治冲击矿压技术研究[J].煤炭学报,2015,40(6):1347-1352.
HeJiang,DouLinming,GongSiyuan,et al.Research on rock burst prevention technology of roof-cutting roadway in inclined thin coal seam[J].Journal of China Coal Society,2015,40(6):1347-1352.
11 于斌,刘长友,杨敬轩,等.坚硬厚层顶板的破断失稳及其控制研究[J].中国矿业大学学报,2013,42(3):342-348.
YuBin,LiuChangyou,YangJingxuan,et al.Research on the fracture instability and its control technique of hard and thick roof[J].Journal of China University of Mining and Technology,2013,42(3):342-348.
12 郝旭彬,杨立辉,万胜,等.基于AHP及模糊综合评判法的采空区稳定性评价[J].黄金科学技术,2013,21(6):63-67.
HaoXubin,YangLihui,WanSheng,et al.Stability evaluation for mine gob areas based on AHP and fuzzy synthetic judgment theory[J].Gold Science and Technology,2013,21(6):63-67.
13 孙杨,罗黎明,邓红卫.金属矿山深部采场稳定性分析与结构参数优化[J].黄金科学技术,2017,25(1):99-105.
SunYang,LuoLiming,DengHongwei.Stability analysis and parameter optimization of stope in deep metal mines[J].Gold Science and Technology,2017,25(1):99-105.
14 罗铁牛.独立采空区稳定性研究与经验教训[J].黄金科学技术,2003,11(1):33-37.
LuoTieniu.The disquisition and experience of the stability of the independent hollow areas[J].Gold Science and Technology,2003,11(1):33-37.
15 张耀平,曹平,袁海平,等.复杂采空区稳定性数值模拟分析[J].采矿与安全工程学报,2010,27(2):232-238.
ZhangYaoping,CaoPing,YuanHaiping,et al.Numerical simulation on stability of complicated goaf[J].Journal of Mining and Safety Engineering,2010,27(2):232-238.
16 张成良,杨绪祥,李风,等.大型采空区下持续开采空区稳定性研究[J].武汉理工大学学报,2010,32(8):117-120.
ZhangChengliang,YangXuxiang,LiFeng,et al.Stability study on mined-out area with continuous mining under the large scale mined-out area[J].Journal of Wuhan University of Technology,2010,32(8):117-120.
17 吴爱祥,王贻明,胡国斌.采空区顶板大面积冒落的空气冲击波[J].中国矿业大学学报,2007,36(4):473-477.
WuAixiang,WangYiming,HuGuobin.Air shock wave induced by roof falling in a large scale in ultra-huge mined-area[J].Journal of China University of Mining and Technology,2007,36(4):473-477.
18 邢平伟,付玉平,李志军,等.采场顶板飓风耦合模型及采高对飓风灾害的影响[J].中北大学学报,2010,31(3):227-231.
XingPingwei,FuYuping,LiZhijun,et al.Coupling model of stope roof with hurricane disaster and the influence analysis of mining height on hurricane velocity[J].Journal of North University of China,2010,31(3):227-231.
19 顾铁凤,宋选民.封闭采空区顶板垮落—空气冲击耦合模型与差分解法[J].煤炭学报,2008,33(11):1211-1216.
GuTiefeng,SongXuanmin.The air impulsion coupling model with roof caving and its difference solution under closed goaf[J].Journal of China Coal Society,2008,33(11):1211-1216.
20 严国超,息金波,宋选民,等.采场冲击气浪的灾害模拟[J].辽宁工程技术大学学报(自然科学版),2009,28(2):177-180.
YanGuochao,XiJinbo,SongXuanmin,et al.Simulation of lashing blast of compressed air in coal face[J].Journal of Liaoning Technical University(Natural Science),2009,28(2):177-180.
21 邵晓宁.厚硬砂岩顶板破断规律及深孔超前爆破弱化技术研究[D].合肥:安徽理工大学,2014.
ShaoXiaoning.Research of Fracture Law and Deep Hole Advance Blasting Technology in Hard and Thick Sandstone Roof[D].Hefei:Anhui University of Science and Technology,2014.
22 马维绪.煤矿通风与安全技术[M].北京:煤炭工业出版社,2007.
MaWeixu.Ventilation and Safety Techniques in Coal Mines[M].Beijing:China Coal Industry Publishing House Press,2007.
23 中华人民共和国国家安全生产监督管理总局.煤矿安全规程[S].北京:煤炭工业出版社,2016.
State Administration of Work Safety of the People’s Republic of China.Mine safety standards[S].Beijing:China Coal Industry Publishing House Press,2016.
[1] Zhonglei GUO, Yu CUI, Chunlong WANG. Application of Local Refrigeration and Cooling Technology in Underground Long-distance Excavation Tunnel [J]. Gold Science and Technology, 2024, 32(5): 916-925.
[2] Kuan LIU, Guanwang MO, Xiang LI, Pinghuan SHEN, Bo WAN, Jiankun LIU. Optimization of the Construction Parameters of Super-large Section Flat Structure Tunnel [J]. Gold Science and Technology, 2024, 32(2): 330-344.
[3] Rui LIANG, Xiaorui CAO, Wenhai ZHOU, Xiaoming LOU, Caizhi HU, Shujiang WANG. Effect of Uncoupled Charge Coefficients on Rock Blast Damage [J]. Gold Science and Technology, 2024, 32(2): 306-317.
[4] Yuqing ZHENG,Yong CHEN,Jinhua WANG,Xueyi SHANG,Caiyun LIU. Acoustic Emission Localization Method for Complex Structure Based on Improved Interaction Distance and Dijkstra Algorithm and Its Application [J]. Gold Science and Technology, 2022, 30(3): 427-437.
[5] Tingxin WEN,Huanbo SU. Combined Weighting-Extremely Randomized Trees Rockburst Prediction Model Based on MICE_ RF [J]. Gold Science and Technology, 2022, 30(3): 392-403.
[6] Guoyan ZHAO,Chengkai DANG,Huanxin LIU,Yang LIU,Quri XIAO,Yang LI,Liqiang CHEN,Wenjie MAO. Evaluation of Mine Rockburst Tendency Based on the Distance Discrimination Analysis [J]. Gold Science and Technology, 2021, 29(5): 690-697.
[7] Yuxian KE,Cheng WANG,Lifa FANG,Baoquan LIAO. Mine Safety Production Status Evaluation Based on Combination Weight and Matter Element Analysis [J]. Gold Science and Technology, 2020, 28(6): 910-919.
[8] Chunhui SONG, Xianglong LI, Jianguo WANG, Fei SONG. Experimental Study on the Effect of Pillar Blasting Mining on the Damage of Cemented Filling Body [J]. Gold Science and Technology, 2020, 28(4): 558-564.
[9] Yuanfeng DONG,Rongjun SI,Zhonglin XIANG,Chaochen FENG,Guoquan ZHANG,Yingmei ZHANG. Analysis of Mineralization Space in Guilaizhuang Gold Mining Area Based on Surpac Software [J]. Gold Science and Technology, 2019, 27(2): 163-171.
[10] Sheng ZENG,Shaoping WANG,Ni ZHANG. Research Progress of Rock Crack Propagation Under Impact Loading [J]. Gold Science and Technology, 2019, 27(1): 52-62.
[11] Jinguo XU,Xingguo DAI,Zezheng YAN. Stability Evaluation of Rock-soil Slope Based on D-S Evidence Theory and Normal Degree of Membership [J]. Gold Science and Technology, 2018, 26(6): 780-787.
[12] Guanghe LIANG. Discussion on Several Key Problems of the Tanlu Fault [J]. Gold Science and Technology, 2018, 26(5): 543-558.
[13] ZHOU Hailin,YANG Shan,CHEN Jianhong . Research and Application of Cleaner Production Evaluation Index System in Gold Mine [J]. Gold Science and Technology, 2017, 25(5): 93-100.
[14] FENG Xuefei,LUO Zhouquan,WANG Wei,LU Fan. Study and Application of RS-CPM Model for Analysis of Mined Goaf Insta-bility [J]. Gold Science and Technology, 2015, 23(3): 67-72.
[15] HE Yingwei,CAO Junqi,MIN Fanghui,LIU Fei. Accuracy Analysis and Improvement of Total Station Hidden Point Measuring in Single Distance [J]. J4, 2011, 19(4): 73-76.
Viewed
Full text


Abstract

Cited

  Shared   
  Discussed   
No Suggested Reading articles found!