Gold Science and Technology ›› 2019, Vol. 27 ›› Issue (5): 712-721.doi: 10.11872/j.issn.1005-2518.2019.05.712
• Mining Technology and Mine Management • Previous Articles Next Articles
CLC Number:
1 | 曹新元,吕古贤,朱裕生 . 我国主要金属矿产资源及区域分布特点[J]. 资源产业,2004,6(4): 20-22. |
Cao Xinyuan , Guxian Lü , Zhu Yusheng . The characteristics of regional distribution of the major metal minerals resources in China[J]. Resources and Industries,2004,6(4): 20-22. | |
2 | 国家自然科学基金委员会 . 未来10年中国科学发展战略(工程科学)[M]. 北京: 科学出版社,2012. |
National Natural Science Foundation of China .Chinese Science Development Strategy (Engineering Science) in the Next 10 Years[M]. Beijing: Science Press,2012. | |
3 | 陈庆发 . 隐患资源开采与采空区治理协同研究[D]. 长沙: 中南大学,2009. |
Chen Qingfa . Study on Synergism of Hidden Danger Resources Mining and Goafs Treatment[D].Changsha: Central South University,2009. | |
4 | 牛文静,陈庆发,刘严中,等 . 低品位厚大矿体多中段协同开采步距计算方法[J]. 金属矿山,2016,51(9): 23-29. |
Niu Wenjing , Chen Qingfa , Liu Yanzhong ,et al . Step calculation technique for multi-stage synergistic mining of low-grade large-thick ore-body[J]. Metal Mine,2016,51(9): 23-29. | |
5 | 杨驰,吴建胜,郭连军,等 . 露天矿多采区协同开采资源配置优化[J]. 金属矿山,2017,52(6): 18-23. |
Yang Chi , Wu Jiansheng , Guo Lianjun ,et al . Ore-blending optimization via collaborative mining of multiple mining areas in open-pit mine[J]. Metal Mine,2017,52(6): 18-23. | |
6 | 于斌,杨敬轩,高瑞 .大同矿区双系煤层开采远近场协同控顶机理与技术[J]. 中国矿业大学学报,2018,47(3): 486-493. |
Yu Bin , Yang Jingxuan , Gao Rui .Mechanism and technology of roof collaborative controlling in the process of Jurassic and carboniferous coal mining in Datong mining area[J]. Journal of China University of Mining and Technology,2018,47(3): 486-493. | |
7 | Fan X M , Ren F Y , Xiao D ,et al . Opencast to underground iron ore mining technique[J]. Journal of Central South University,2018,25(7): 1813-1824. |
8 | 孙会熙,吴爱祥,张磊,等 . 某钒铁矿分区协同开采方案优化[J]. 金属矿山,2016,51(9): 30-34. |
Sun Huixi , Wu Aixiang , Zhang Lei ,et al . Optimization of mining scheme on the partitioning collaborative mining of a vanadium and iron mine[J]. Metal Mine,2016,51(9): 30-34. | |
9 | 陈阳,许梦国,程爱平,等 . 程潮铁矿崩落法和充填法协同开采方案优化研究[J]. 矿业研究与开发,2017,37(11): 1-4. |
Chen Yang , Xu Mengguo , Cheng Aiping ,et al . Optimization research on collaborative mining by caving technique and filling technique in Chengchao Iron Mine[J]. Mining Research and Development,2017,37(11): 1-4. | |
10 | 北京京北职业技术学院 . 创新能力培训教程[M]. 北京: 中国商务出版社,2004. |
Beijing Jingbei Vocational and Technical College . Innovative Ability Training Course[M]. Beijing: China Business Press,2004. | |
11 | 陈庆发,吴仲雄 . 大量放矿同步充填无顶柱留矿采矿方法: 中国,201010181971.2[P]. 2010-10-20. |
Chen Qingfa , Wu Zhongxiong . The synchronized to fill the mining technique for a large amount of orebody removed without top pillar: China,201010181971.2[P]. 2010-10-20. | |
12 | 周爱民 .立体分区大量崩矿采矿方法:中国,201110256519.2[P]. 2011-09-01. |
Zhou Aimin . The landslide mining technique for a large of orebody in three-dimensional partition: China,201110256519.2[P]. 2011-09-01. | |
13 | 陈何,孙忠铭,王湖鑫,等 . 一种连续崩落采矿方法: 中国,201110109103.8[P]. 2011-04-29. |
Chen He , Sun Zhongming , Wang Huxin ,et al . A progressive caving mining technique: China,201110109103.8[P]. 2011-04-29. | |
14 | 陈庆发,张亚南,吴仲雄 . 分段凿岩并段出矿分段矿房采矿法: 中国,201310331194.9[P]. 2013-08-01. |
Chen Qingfa , Zhang Yanan , Wu Zhongxiong . A sublevel room mining technique with sublevel rock drilling overall ore removal: China,201310331194.9[P]. 2013-08-01. | |
15 | 邓红卫,周科平,李杰林,等 . 组合再造结构体中深孔落矿协同锚索支护嗣后充填采矿法: 中国,201310404154.2[P]. 2013-09-06. |
Deng Hongwei , Zhou Keping , Li Jielin ,et al . The subsequent filling mining technique after coordinated anchor cable support under the mid-depth blasthole condition for composite structure: China,201310404154.2[P]. 2013-09-06. | |
16 | 胡建华,罗先伟,周科平,等 . 分条间柱全空场开采嗣后充填协同采矿法: 中国,201310658513.7[P]. 2013-12-09. |
Hu Jianhua , Luo Xianwei , Zhou Keping ,et al . The subsequent filling mining with full space mining between the columns: China,201310658513.7[P]. 2013-12-09. | |
17 | 李启月,王卫华,尹土兵,等 . 垂直孔与水平孔协同回采的机械化分段充填采矿法: 中国,201410257493.7[P]. 2014-06-11. |
Li Qiyue , Wang Weihua , Yin Tubing ,et al . A filling mining technique with mechanized section for the vertical hole and the horizontal hole work together: China,201410257493.7[P]. 2014-06-11. | |
18 | 陈庆发,陈青林,吴贤图,等 . 采场台阶布置多分支溜井共贮矿段协同采矿方法: 中国,201510673789.1[P]. 2015-10-16. |
Chen Qingfa , Chen Qinglin , Wu Xiantu ,et al . A synergism mining technique with multi-branch ore deposits for layout of stope steps: China,201510673789.1[P]. 2015-10-16. | |
19 | 陈何,黄丹,杨超,等 . 一种缓倾斜薄矿体采矿方法: 中国,201511019114.1[P]. 2015-12-30. |
Chen He , Huang Dan , Yang Chao ,et al . A mining technique for the slight slope and thin orebody: China,201511019114.1[P]. 2015-12-30. | |
20 | 雷涛,代光俊,叶海旺,等 . 厚大矿体无采空区同步放矿充填采矿方法: 中国,201610366837.7[P]. 2016-05-27. |
Lei Tao , Dai Guangjun , Ye Haiwang ,et al . A filling mining technique with synchronous orebody removed for thick orebody without goaf: China,201610366837.7[P]. 2016-05-27. | |
21 | 孙丽军,汪为平,孙国权,等 . 一种地下矿山井下双采场协同开采的新方法: 中国,201610439450X.[P]. 2016-06-20. |
Sun Lijun , Wang Weiping , Sun Guoquan ,et al . A new technique of synergetic mining for underground mine with double stope: China,201610439450X[P]. 2016-06-20. | |
22 | 陈庆发,刘俊广,黎永杰,等 . 电耙—爆力协同搬运伪倾斜房柱采矿法: 中国,201610577976.4[P]. 2016-07-22. |
Chen Qingfa , Liu Junguang , Li Yongjie ,et al . A pillar mining technique for false tilt orebody with electric rake-explosive force coordinated transport: China,201610577976.4[P]. 2016-07-22. | |
23 | 陈庆发,胡华瑞,陈青林 . 柔性隔离层充当假顶的分段崩落协同采矿方法: 中国,201610577993.8[P]. 2016-07-22. |
Chen Qingfa , Hu Huarui , Chen Qinglin . The sublevel caving synergetic mining technique for the flexible isolation layer acts as a false roof: China,201610577993.8[P]. 2016-07-22. | |
24 | 雷涛,赵昀,叶海旺,等 . 垂直深孔两次放矿同步充填阶段采矿法: 中国,201611059708X.[P]. 2016-11-21. |
Lei Tao , Zhao Yun , Ye Haiwang ,et al . The synchronous filling stage mining technique for perpendicular mid-depth blasthole after two orebody removed: China,201611059708X.[P]. 2016-11-21. | |
25 | 陈庆发,李世轩,胡华瑞,等 . 浅孔凿岩爆力—电耙协同运搬分段矿房采矿法: 中国,201611103740.3[P]. 2016-12-05. |
Chen Qingfa , Li Shixuan , Hu Huarui ,et al . The sublevel room mining technique with explosive force-electric harrow to carry for shallow hole drilling: China,201611103740.3[P]. 2016-12-05. | |
26 | 陈庆发,胡华瑞,李世轩,等 . 底部结构下卡车直接出矿后期放矿充填同步水平深孔留矿法: 中国,201611105283.1[P]. 2016-12-05. |
Chen Qingfa , Hu Huarui , Li Shixuan ,et al . The horizontal deep hole retention technique for filling synchronization after orebody removed with the truck under the bottom structure condition: China,201611105283.1[P]. 2016-12-05. | |
27 | 陈庆发,胡华瑞,陈青林 . 卡车协同出矿有底柱分段崩落法: 中国,201710154314.0[P]. 2017-03-15. |
Chen Qingfa , Hu Huarui , Chen Qinglin . The sublevel caving technique having sill pillar for orebody collaboratively removed with the truck: China,201710154314.0[P]. 2017-03-15. | |
28 | 陈庆发,蒋腾龙,胡华瑞,等 . 卡车协同出矿分段凿岩阶段矿房法: 中国,201710153260.6[P]. 2017-03-15. |
Chen Qingfa , Jiang Tenglong , Hu Huarui ,et al . The room mining technique of sublevel drilling for orebody collaboratively removed with the truck: China,201710153260.6[P]. 2017-03-15. | |
29 | 洪燕云 . 创新思维与创新技法的应用[J]. 茶叶机械杂志,2000,7(2): 1-3. |
Hong Yanyun . Application of innovative thinking and innovative techniques[J]. Journal of Tea Machinery,2000,7(2): 1-3. | |
30 | 王传友,王国洪 . 创新思维与创新技法[M]. 北京: 人民交通出版社,2006. |
Wang Chuanyou , Wang Guohong . Innovative Thinking and Innovative Techniques[M]. Beijing: China Communications Press,2006. | |
31 | 侯光明 . 创新方法系统集成及应用[M]. 北京: 科学出版社,2012. |
Hou Guangming . System Integration and Application of Innovative Techniques[M]. Beijing: Science Press,2012. | |
32 | 黄斌 . 工科研究生创新能力研究[D]. 广州: 广东工业大学,2008. |
Huang Bin . Research on Engineering Graduate Innovation[D]. Guangzhou: Guangdong University of Technology,2008. | |
33 | 陈庆发 . 协同采矿方法的发展及类组归属[J]. 金属矿山,2018,53(10): 1-6. |
Chen Qingfa . Development and classification of collaborative mining techniques[J]. Metal Mine,2018,53(10): 1-6. |
[1] | Shuang HUANG, Mingtao JIA, Fang LU. Optimization Model of Underground Stope Working Plan Based on Heuristic Genetic Algorithm [J]. Gold Science and Technology, 2023, 31(4): 669-679. |
[2] | Jielin LI,Dehua MAO,Chaozhi PENG,Shengli WANG,Mengbing FENG,Mingliang ZHAO,Ao LI. A Study of Construction Technology and Application of Pulp-Soil Decline at an Underground Metal Mine [J]. Gold Science and Technology, 2022, 30(6): 901-911. |
[3] | Xiuzhi SHI,Chunsheng DING,Yaguang QIN. Research on the Effect Mechanism of Safety Culture on Employee Safety Behavior in Metal Mines [J]. Gold Science and Technology, 2021, 29(4): 593-601. |
[4] | Zhenyu NIE,Keping ZHOU,Zhipeng LIANG. Teaching and Training of Mine Roof Fall Accident Based on VR Technology [J]. Gold Science and Technology, 2021, 29(4): 620-628. |
[5] | Lipeng WANG,Fang YAN,Zijun LI,Fang WANG. Dynamic Status Evaluation of Main Fans of Mine at High Altitude Region [J]. Gold Science and Technology, 2020, 28(6): 930-939. |
[6] | Shanfei WANG, Kang WANG, Fengshan MA, Rong LU. Optimization of Three-underground Mining Technology and Disaster Prevention in Sanshandao Gold Mine [J]. Gold Science and Technology, 2020, 28(5): 734-742. |
[7] | Meng WANG, Xiuzhi SHI, Shu ZHANG. Evaluation Research on Safety Guarantee Conditions of Underground Metal Mines Oriented to Optimizing Production Capacity [J]. Gold Science and Technology, 2020, 28(5): 753-760. |
[8] | Guoyan ZHAO,Ju QIU,Yuan ZHAO,Dianfei PEI,Yang LI,Pan WU. Discussion on Evaluation Method of Green Mining in Metal Mines [J]. Gold Science and Technology, 2020, 28(2): 169-175. |
[9] | Rongrong LI,Zijun LI,Yilong HUANG,Shuqi ZHAO. Ventilation Mode Optimization of Mining Face at High Altitude Based on ANP [J]. Gold Science and Technology, 2020, 28(2): 301-308. |
[10] | Xiaoming LIU,Lei DENG,Liguan WANG,Shunhua DENG,Xinfeng YANG,You WAN,Yanjun HE. Intelligent Mine Master Plan for Underground Metal Mine [J]. Gold Science and Technology, 2020, 28(2): 309-316. |
[11] | Li CHENG,Huanxin LIU,Mingde ZHU,Qinzheng WU. Current Situation and Prospect of Research on Underground Goaf in Metal Mines [J]. Gold Science and Technology, 2020, 28(1): 70-81. |
[12] | Zhuan DAI,Zhouquan LUO,Yaguang QIN,Lei WEN,Chunsheng DING,Zhezhe DONG. Construction and Evaluation of Generalized Safety Management Model for Underground Metal Mines [J]. Gold Science and Technology, 2019, 27(6): 920-930. |
[13] | Jiayuan CAO,Fengshan MA,Jie GUO,Guodong ZHANG,Zhaoping LI. Study on Subsidence Prediction of Inclined Orebody Cut and Fill Mining in Seabed [J]. Gold Science and Technology, 2019, 27(4): 522-529. |
[14] | Junhui ZENG,Xibing LI. Prediction of Mine Subsidence Area Based on Chaotic Time Series Analysis [J]. Gold Science and Technology, 2019, 27(2): 249-256. |
[15] | Guoyan ZHAO,Haiyun ZHANG,Jian LIU,Ying CHEN. GSO-GPR Model for Strata Displacement Angle Predicting and Its Application [J]. Gold Science and Technology, 2019, 27(1): 63-71. |
|