img

Wechat

Adv. Search

Gold Science and Technology ›› 2021, Vol. 29 ›› Issue (3): 345-354.doi: 10.11872/j.issn.1005-2518.2021.03.189

• Mineral Exploration and Resource Evaluation • Previous Articles     Next Articles

Automatic Construction Method of Constraint Rules for Implicit Modeling of Geological Bodies Based on Borehole Data

Bo WANG(),Kang HE,Deyun ZHONG()   

  1. School of Resources and Safety Engineering,Central South University,Changsha 410083,Hunan,China
  • Received:2020-10-24 Revised:2021-01-11 Online:2021-06-30 Published:2021-07-14
  • Contact: Deyun ZHONG E-mail:wangbo_lingli@163.com;deyizhiyun@163.com

Abstract:

Three-dimensional geological modeling can be divided into traditional wireframe modeling and implicit modeling.Compared with traditional wireframe modeling,implicit modeling method does not require a large number of human-computer interactions,and has the advantages of high model quality,repeatable process and fast local dynamic update speed.After years of research,various interpolation methods for implicit modeling have been developed,but the constraint data required for implicit modeling interpolation requires a lot of preprocessing,for a wide range of geological modeling work,manual processing of interpolation constraint data requires a lot of time and energy for geologists,and the operation of geological modeling based on manual processing is semi-automatic implicit modeling.In order to improve the automation degree of geologic body implicit modeling method,we proposed a method of automatic extraction and quantification of formation characteristic parameters based on borehole data,which can take into account the global occurrence characteristics of stratum and the local occurrence trend of borehole,and be used to construct interpolation constraints that control the geometry of different geological interfaces.This method analyzes the original geological drilling data,automatically extracts the occurrence of the formation to characterize the global interpolation trend of the formation,and then uses the local ellipsoid search to construct the neighborhood drilling group,extracts the field boundary point set according to different search strategies,and finally calculates the local occurrence parameters to construct local interpolation trends.Based on the above ideas,combined with the implicit modeling method of geological bodies considering the constraints of stratigraphic sequence,a complete geological body model that conforms to stratigraphic characteristics and satisfies the laws of stratigraphic sequence was constructed.The data extracted by this method were used to construct a single geological model of a uranium deposit in Xinjiang using the potential field method and the HRBF method,after that,a comprehensive model of complex shapes was constructed with full consideration of the constraints of geological rules.Comparison of the geometric form of a single model built by the two interpolation methods and the comparison of the exploration line profile of the overall model,the research results show that the new method takes into account the geological rules and constraints,can simulate sedimentary strata and intrusions strata well,and the model has good accuracy and conforms to the cognitive rules of geologists.

Key words: implicit modeling, borehole data, geological modeling, geological rule constraint, formation characteristic parameters, local ellipsoid

CLC Number: 

  • TD67

Fig.1

Relationship diagram of gradient data and azimuth information"

Fig.2

Automatic construction process of geological rule constraints"

Fig.3

Projection diagram of original borehole point data set"

Fig.4

Schematic diagram of neighborhood borehole group"

Fig.5

Schematic diagram of feature point set extraction"

Fig.6

Calculation of local occurrence parameters"

Fig.7

Borehole data and boundary point set diagram"

Fig.8

Superposition display effect diagram of potential field method and HRBF method"

Fig.9

Solution technology roadmap of Gempy complex geological model"

Table 1

Sequence law and sequence relationship of strata"

地层序列地层层序序列关系地层属性
细砂岩层8Erode侵入体
泥岩层7Erode侵入体
粗砂岩层6Erode侵入体
中砂岩层5Erode侵入体
顶层4Onlap沉积层
煤层3Onlap沉积层
砂泥混合层2Onlap沉积层
基岩1Onlap沉积层

Fig.10

Effect diagram of 3D geological surface model"

Fig.11

Section diagram of 3D geological model"

Aug C,2004.3D Geological Modelling and Uncertainty: The Potential-field Method[D].Paris:Ecole Nationale Superieure des Mines de Paris.
Baker K A,Pixley A F,1975.Polynomial interpolation and the Chinese Remainder Theorem for algebraic systems[J].Mathematische Ztschrift,143(2):165-174.
Bi Lin,Zhao Hui,Li Yalong,al et,2018.Biased-SVM and Poisson surface based three-dimensional automatic modeling method for orebodies[J].Journal of China University of Mining & Technology,47(5):1123-1130.
Calcagno P,Chilès J P,Courrioux G,al et,2008.Geological modelling from field data and geological knowledge:Part I.Modelling method coupling 3D potential-field interpolation and geological rules[J].Physics of the Earth and Planetary Interiors,171(1/2/3/4):147-157.
Cuomo S,Galletti A,Giunta G,al et,2017.Reconstruction of implicit curves and surfaces via RBF interpolation[J].Applied Numerical Mathematics,116:157-171.
Dong Zhaogang,2000.Calculate the occurrence of the surface by three-point coordinates in a plane of space[J].Yunnan Geology,(3):304-307.
Fleishman S,Cohen-Or D,Silva,al et,2005.Robust moving least-squares fitting with sharp features[J]. ACM Transaction on Graphics,24(3):544-552.
Frank T,Tertois A L,Mallet J L,2007.3D-reconstruction of complex geological interfaces from irregularly distributed and noisy point data[J].Computers & Geoences,33(7):932-943.
Guo J,Wu L,Zhou W,al et,2018.Section-constrained local geological interface dynamic updating method based on the HRBF surface[J].Journal of Structural Geology,107:64-72.
Guo Jiateng,Wu Lixin,Zhou Wenhui,2016.Implicit automatic 3D modeling method of ore body based on radial basis function surface[J].Journal of China Coal Society,41(8):2130-2135.
Lajaunie C,Courrioux G,Manuel L,1997.Foliation fields and 3D cartography in geology:Principles of a method based on potential interpolation[J].Mathematical Geology,29(4):571-584.
Lu G Y,Wong D W,2008.An adaptive inverse-distance weighting spatial interpolation technique[J].Computers & Geoences,34(9):1044-1055.
McInerney P,Guillen A,Courrioux G,al et,2005.Building 3D geological models directly from the data? A new approach applied to Broken Hill,Australia[J].Digital Mapping Te-chniques’05,5:119-130.
Miguel D L V,Schaaf A,Wellmann F,2019.GemPy 1.0:Open-source stochastic geological modeling and inversion[J].Geoscientific Model Development,12(1):1-32.
Olivier R,Cao H Q,2012.Nearest neighbor value interpolation[J].International Journal of Advanced Computer Sciences and Application,3(4):25-30.
Skala V,2017.RBF interpolation with CSRBF of large data sets[J].Procedia Computer Science,108:2433-2437.
Thornton J M,Mariethoz G,Brunner P,2018.A 3D geological model of a structurally complex Alpine region as a basis for interdisciplinary research[J].Scientific Data,5(1):1-20.
Wang J,Zhao H,Bi L,al et,2018.Implicit 3D modeling of ore body from geological boreholes data using hermite radial basis functions[J].Minerals,8(10):443.
Wu Lixin,Wang Yunjia,Ding Enjie,al et,2012.Three discussions on digital mines:Leveraging the internet of things to ensure mine safety and intelligent mining[J].Journal of China Coal Society,37(3):357-365.
Zhang Shen,Ding Enjie,Zhao Xiaohu,al et,2007.Digital mine and its two basic platform construction[J].Journal of China Coal Society,(9):997-1001.
Zhong D Y,Wang L G,Bi L,al et,2019a.Implicit modeling of complex orebody with constraints of geological rules[J].Transactions of Nonferrous Metals Society of China,29(11):2392-2399.
Zhong D Y,Wang L G,Bi L,al et,2019b.Implicit surface reconstruction based on generalized radial basis functions interpolant with distinct constraints[J].Applied Mathematical Modelling,71:408-420.
毕林,赵辉,李亚龙,等,2018.基于Biased-SVM和Poisson曲面矿体三维自动建模方法[J].中国矿业大学学报,47(5):1123-1130.
董兆岗,2000.通过空间一平面内三点坐标计算该面产状[J].云南地质,(3):304-307.
郭甲腾,吴立新,周文辉,2016.基于径向基函数曲面的矿体隐式自动三维建模方法[J].煤炭学报,41(8):2130-2135.
吴立新,汪云甲,丁恩杰,等,2012.三论数字矿山——借力物联网保障矿山安全与智能采矿[J].煤炭学报,37(3):357-365.
张申,丁恩杰,赵小虎,等,2007.数字矿山及其两大基础平台建设[J].煤炭学报,(9):997-1001.
[1] Ming WEI,Bin ZHAO,Rui WANG,Zhenxing PAN,Liguo CAO. Study on the Distribution of Mineral Grades Based on 3D Model:Taking Shaanxi Longtougou Gold Mine as an Example [J]. Gold Science and Technology, 2019, 27(2): 172-180.
[2] Le AN,Hujun HE,Xingke YANG,Ke HAN,Bin LI,Guozhao HU. Construction of 3D Geological Model and Prospecting Prediction of Matigou Gold Deposit Based on Surpac [J]. Gold Science and Technology, 2018, 26(5): 586-595.
[3] ZHOU Kun,ZHENG Liming. Application of the Nearest Neighbor Method in Delineation of Noble Metal Ore:Taking a Layered Platinum Ore in South Africa as an Example [J]. Gold Science and Technology, 2013, 21(3): 55-58.
Viewed
Full text


Abstract

Cited

  Shared   
  Discussed   
No Suggested Reading articles found!