Gold Science and Technology ›› 2021, Vol. 29 ›› Issue (3): 345-354.doi: 10.11872/j.issn.1005-2518.2021.03.189
• Mineral Exploration and Resource Evaluation • Previous Articles Next Articles
Bo WANG(),Kang HE,Deyun ZHONG()
CLC Number:
Aug C,2004.3D Geological Modelling and Uncertainty: The Potential-field Method[D].Paris:Ecole Nationale Superieure des Mines de Paris. | |
Baker K A,Pixley A F,1975.Polynomial interpolation and the Chinese Remainder Theorem for algebraic systems[J].Mathematische Ztschrift,143(2):165-174. | |
Bi Lin,Zhao Hui,Li Yalong,al et,2018.Biased-SVM and Poisson surface based three-dimensional automatic modeling method for orebodies[J].Journal of China University of Mining & Technology,47(5):1123-1130. | |
Calcagno P,Chilès J P,Courrioux G,al et,2008.Geological modelling from field data and geological knowledge:Part I.Modelling method coupling 3D potential-field interpolation and geological rules[J].Physics of the Earth and Planetary Interiors,171(1/2/3/4):147-157. | |
Cuomo S,Galletti A,Giunta G,al et,2017.Reconstruction of implicit curves and surfaces via RBF interpolation[J].Applied Numerical Mathematics,116:157-171. | |
Dong Zhaogang,2000.Calculate the occurrence of the surface by three-point coordinates in a plane of space[J].Yunnan Geology,(3):304-307. | |
Fleishman S,Cohen-Or D,Silva,al et,2005.Robust moving least-squares fitting with sharp features[J]. ACM Transaction on Graphics,24(3):544-552. | |
Frank T,Tertois A L,Mallet J L,2007.3D-reconstruction of complex geological interfaces from irregularly distributed and noisy point data[J].Computers & Geoences,33(7):932-943. | |
Guo J,Wu L,Zhou W,al et,2018.Section-constrained local geological interface dynamic updating method based on the HRBF surface[J].Journal of Structural Geology,107:64-72. | |
Guo Jiateng,Wu Lixin,Zhou Wenhui,2016.Implicit automatic 3D modeling method of ore body based on radial basis function surface[J].Journal of China Coal Society,41(8):2130-2135. | |
Lajaunie C,Courrioux G,Manuel L,1997.Foliation fields and 3D cartography in geology:Principles of a method based on potential interpolation[J].Mathematical Geology,29(4):571-584. | |
Lu G Y,Wong D W,2008.An adaptive inverse-distance weighting spatial interpolation technique[J].Computers & Geoences,34(9):1044-1055. | |
McInerney P,Guillen A,Courrioux G,al et,2005.Building 3D geological models directly from the data? A new approach applied to Broken Hill,Australia[J].Digital Mapping Te-chniques’05,5:119-130. | |
Miguel D L V,Schaaf A,Wellmann F,2019.GemPy 1.0:Open-source stochastic geological modeling and inversion[J].Geoscientific Model Development,12(1):1-32. | |
Olivier R,Cao H Q,2012.Nearest neighbor value interpolation[J].International Journal of Advanced Computer Sciences and Application,3(4):25-30. | |
Skala V,2017.RBF interpolation with CSRBF of large data sets[J].Procedia Computer Science,108:2433-2437. | |
Thornton J M,Mariethoz G,Brunner P,2018.A 3D geological model of a structurally complex Alpine region as a basis for interdisciplinary research[J].Scientific Data,5(1):1-20. | |
Wang J,Zhao H,Bi L,al et,2018.Implicit 3D modeling of ore body from geological boreholes data using hermite radial basis functions[J].Minerals,8(10):443. | |
Wu Lixin,Wang Yunjia,Ding Enjie,al et,2012.Three discussions on digital mines:Leveraging the internet of things to ensure mine safety and intelligent mining[J].Journal of China Coal Society,37(3):357-365. | |
Zhang Shen,Ding Enjie,Zhao Xiaohu,al et,2007.Digital mine and its two basic platform construction[J].Journal of China Coal Society,(9):997-1001. | |
Zhong D Y,Wang L G,Bi L,al et,2019a.Implicit modeling of complex orebody with constraints of geological rules[J].Transactions of Nonferrous Metals Society of China,29(11):2392-2399. | |
Zhong D Y,Wang L G,Bi L,al et,2019b.Implicit surface reconstruction based on generalized radial basis functions interpolant with distinct constraints[J].Applied Mathematical Modelling,71:408-420. | |
毕林,赵辉,李亚龙,等,2018.基于Biased-SVM和Poisson曲面矿体三维自动建模方法[J].中国矿业大学学报,47(5):1123-1130. | |
董兆岗,2000.通过空间一平面内三点坐标计算该面产状[J].云南地质,(3):304-307. | |
郭甲腾,吴立新,周文辉,2016.基于径向基函数曲面的矿体隐式自动三维建模方法[J].煤炭学报,41(8):2130-2135. | |
吴立新,汪云甲,丁恩杰,等,2012.三论数字矿山——借力物联网保障矿山安全与智能采矿[J].煤炭学报,37(3):357-365. | |
张申,丁恩杰,赵小虎,等,2007.数字矿山及其两大基础平台建设[J].煤炭学报,(9):997-1001. |
[1] | Ming WEI,Bin ZHAO,Rui WANG,Zhenxing PAN,Liguo CAO. Study on the Distribution of Mineral Grades Based on 3D Model:Taking Shaanxi Longtougou Gold Mine as an Example [J]. Gold Science and Technology, 2019, 27(2): 172-180. |
[2] | Le AN,Hujun HE,Xingke YANG,Ke HAN,Bin LI,Guozhao HU. Construction of 3D Geological Model and Prospecting Prediction of Matigou Gold Deposit Based on Surpac [J]. Gold Science and Technology, 2018, 26(5): 586-595. |
[3] | ZHOU Kun,ZHENG Liming. Application of the Nearest Neighbor Method in Delineation of Noble Metal Ore:Taking a Layered Platinum Ore in South Africa as an Example [J]. Gold Science and Technology, 2013, 21(3): 55-58. |
|