J4 ›› 2005, Vol. 13 ›› Issue (6): 30-34.
• article • Previous Articles Next Articles
XU Xinming, CHENG Zhengnan
CLC Number:
岩金矿山|矿山用电|高低压无功补偿|技术应用
[1] | ZHU Zhiben,WANG Ping, LIU Xiaochun. Build Up Water Method In Inundation Mine Area And Effect of Application [J]. J4, 2005, 13(6): 35-38. |
[2] | LIU Dang-Quan, SUN Ceng-Feng. Pillar Recover of Sublevel Drilling Stage Room Stoping and Draw Managing [J]. J4, 2005, 13(1-2): 58-62. |
[3] | HE Zhijian,WANG Yuejiang,YANG Xiuying. Specialty and Innovation of Stope Technics in Honghuagou Gold Mine [J]. J4, 2004, 12(4): 22-26. |
|