Wechat
J4 ›› 2010, Vol. 18 ›› Issue (6): 63-64.
• article • Previous Articles Next Articles
DU Fei1,ZHAO Jingbo2,WEI Kailin1
Received:
Revised:
Online:
Published:
Abstract:
The applied technology, which is the main mixture shaft in Sanshandao gold mine for six months (including horsehead) continuous tunneling and masonry beyond 100 meters,and the comprehensive use of various machine seamlessly matching and continuous work construction organization in shaft tunneling and masonry,is introduced. The shaft development in rock hardness coefficient more than 10 achieves outstanding achievements.
Key words: Main mixture shaft, Freezing construction method, Slurry explosive, Hydraulic formwork
CLC Number:
TD262
DU Fei,ZHAO Jingbo,WEI Kailin. Study on the Quickly Tunneling and Masonry Technology of Xinli Main Mixture Shaft in Sanshandao Gold Mine[J].J4, 2010, 18(6): 63-64.
0 / / Recommend
Add to citation manager EndNote|Reference Manager|ProCite|BibTeX|RefWorks
URL: http://www.goldsci.ac.cn/EN/
http://www.goldsci.ac.cn/EN/Y2010/V18/I6/63
[1]刘刚.井巷工程[M].徐州:中国矿业大学出版社,2005. [2]戴俊,王树仁,王野萍.爆破工程[M].北京:机械工业出版社,2007. [3]于润沧.采矿工程师手册[M]. 北京:冶金工业出版社,2009. [4]宁恩渐.采掘技术[M].北京:冶金工业出版社,1980.
Cited