J4 ›› 2010, Vol. 18 ›› Issue (5): 68-71.
• article • Previous Articles Next Articles
JIN Sheying
CLC Number:
TD853
[1]李启月,王树海,范作鹏.盘区阶梯式无间柱连续充填采矿法试验研究[J].矿冶工程,2010,(3):36- 39. |
[1] | Xingdong ZHAO,Nan ZENG,Yumin CHEN,Hui WEI,Chenglong WANG,Chenglu HOU,Yunlong DU,Chunchao FAN. Design of the Medium-deep Hole Caving and Subsequent Filling Continuous Mining Technology in Underground Unmanned Mining Area of Sanshandao Gold Mine [J]. Gold Science and Technology, 2021, 29(2): 200-207. |
[2] | Xingxin NIE, Quan GAN, Jian GAO, Shanshan FENG. Research on Safety Roof Span in Continuous Mining of Gold Vein Group Under Synergistic Concept [J]. Gold Science and Technology, 2020, 28(3): 337-344. |
[3] | LIU Runtian,QIU Jungang,ZHANG Zhonghui,GAO Haifeng,LI Jiyu. The Design for Recycling and Using of Low-grade Ore in Jiaojia Gold Mine [J]. J4, 2010, 18(6): 54-57. |
[4] | BAI Fuxin,WANG Shangong,AN Zhihai. Hole and Tight Blasting in Xinhui Gold Mine [J]. J4, 2010, 18(5): 64-67. |
[5] | LI Jun-Feng, WU Ji-Chun, SONG Quan-Wu, LAN Hai-Bei, LIU Wei-Min. Development and Utilization of the Lowest Grade Ore in Linglong Gold Deposit [J]. J4, 2010, 18(2): 63-66. |
[6] | BAI Fuxin,ZHANG Yonglin,ZHANG Bin. Non-cemented Filling Continuous M ining Technology in Xinhui Gold Deposit [J]. J4, 2008, 16(4): 66-69. |
|