img

Wechat

Adv. Search

J4 ›› 2010, Vol. 18 ›› Issue (5): 72-75.

• article • Previous Articles     Next Articles

Study and Application of Medium-length Hole Mining in Xincheng Gold Mine

XU Dong,HU Zhongqiang   

  1. Xincheng Gold Mine,Shandong Gold Mining Co.,Ltd.,Laizhou 261438,Shangdong,China
  • Received:2010-03-24 Revised:2010-09-15 Online:2010-10-28 Published:2012-05-23

Abstract:

The ore body type of the ⅴ# ore body in Xincheng gold mine is the typical thick broken ore body.Based on the actual situation of the mine,decide to mine the ore body with the pre-roof-controlled upward mediumlength hole sublevel mining with backfill.By the pre-roof-controlling, to ensure the roof and upper wall safety, moreover with the upward medium-length hole mining,mining the ore body safety and efficacy came true.

Key words: Medium-length hole mining, Pre-roof-control, Sublevel mining with backfill, Tailing filling

CLC Number: 

  • P618.51

[1]北京有色冶金设计研究总院.采矿设计手册2:矿床开采卷[M].北京:中国建筑工业出版社,1989.
[2]古德生,李夕兵.现代金属矿床开采科学技术[M].北京:冶金工业出版社,2006:125- 158.
[3]张存勇,熊正莲,尹剑飞,等.新城金矿床控矿因素及深部成矿预测[J].黄金,2002,23(6).
[4]韦华南,赵国彦,古德生.新城金矿盘区上向高分层连续回采充填采矿法试验研究[R].第八届国际充填采矿会议论文,2004.

[1] CAO Yingli,QIN Xiuhe,ZHANG Ruizhong,GAO Jincheng. Research and Application of Mining Method of Horizontal Stratified Entrance-Filling of Tailing in Xiadian Gold Mine [J]. J4, 2012, 20(2): 62-66.
[2] LI Yang, BANG Kang, ZHANG Xiao-Gang, CHEN Zhuo, HAO Chun-Guang, WANG Yuan-Kuai. Research of Combined Mining Method of Upward Lane and Downward Horizontal Delamination [J]. J4, 2010, 18(1): 77-79.
[3] CHEN Hua-Zhen, SUN Chao, SONG Chang-Bao. Some Prorblems of the New Tailing Cemnent Material in the Application [J]. J4, 2006, 14(1): 32-35.
Viewed
Full text


Abstract

Cited

  Shared   
  Discussed   
No Suggested Reading articles found!