Numerical Simulation of Cemented Filling Pipeline Transportation of High-density Whole Tailing Based on ANSYS/FLOTRAN

  • YANG Bo ,
  • YANG Shijiao ,
  • WANG Fulin
Expand
  • School of Nuclear Resources Engineering,University of South China,Hengyang    421001,Hunan,China

Received date: 2015-04-22

  Revised date: 2015-06-08

  Online published: 2015-12-09

Abstract

The Gravity-flowed Convey of high-density whole tailing is already widely applied as time goes on and distributed around the globe in metal mine.A detailed numerical simulation study was conducted of a pipeline transportation of high-density whole tailing of iron ore,and based on high-density whole tailing slurry,main physical parameters are defined and the construction of the numerical model of the pipeline transportation of high-density whole tailing cemented filling slurry was also completed at the same time.Depend on the application of ANSYS/FLOTRAN,we will simulate the dynamic feature of high-density whole tailing slurry when it works in the pipeline,and also conducted a comparative analysis between the simulated result and the theoretical value.At the same time,the numerical calculation of transportation of slurry was also conducted and studies the result of the calculation.The slurry whose concentration is between 68% and 78% will achieve Gravity-flowed Convey by the intake velocity of 1.5 m/s,2.0 m/s and 2.5 m/s.When it comes to the simulated result and the theoretical calculation,we find resistance loss of both are almost unanimous.With the initial velocity of slurry increasing,the impact force coming from the concentration of slurry is becoming lighter and lighter at the same time.At last,we can conclude that the numerical model is reasonable and practicable,and this review would provide a theoretical guide for the application of Gravity-flowed Convey of high-density whole tailing cemented filling slurry.

Cite this article

YANG Bo , YANG Shijiao , WANG Fulin . Numerical Simulation of Cemented Filling Pipeline Transportation of High-density Whole Tailing Based on ANSYS/FLOTRAN[J]. Gold Science and Technology, 2015 , 23(5) : 60 -65 . DOI: 10.11872/j.issn.1005-2518.2015.05.060

References

[1] 贺志宏.高村矿区建立干式充填储料系统方案初探[J].黄金科学技术,2004,12(3):18-21.
[2] 路世豹,李晓,廖秋林,等.充填采矿法的应用前景与环境保护[J].有色金属(矿山部分),2004,56(1):2-4.
[3] 贺志坚,王跃江,杨秀瑛.红花沟金矿回采工艺特点与创新[J].黄金科学技术,2004,12(4):22-26.
[4] 田明华.缓倾斜中厚矿体机械化上向水平分层充填采矿法关键技术研究[D].长沙:中南大学,2009.
[5] 马云庆,王瑞星,何顺斌,等.无底柱后退式竖向分条分段充填采矿法研究[J].黄金科学技术,2014,22(4):67-71.
[6] 乔登攀,程伟华,张磊,等.现代采矿理念与充填采矿[J].有色金属科学与工程,2011,2(2):7-14.
[7] 王新民,肖卫国,张钦礼.深井矿山充填理论与技术[M].长沙: 中南大学出版社,2010:12-40.
[8] 薛希龙.黄梅磷矿高浓度金尾砂充填技术研究[D].长沙:中南大学,2012.
[9] 朱国清.高浓度结构流全尾砂胶结充填实验研究与应用[J].矿业工程,2011,9(6):20-22.
[10] 吴迪,蔡嗣经,杨威,等.基于CFD的充填管道固液两相流输送模拟及试验[J].中国有色金属学报,2012,22(7):2133-2140.
[11] Wang X M,Zhao J W,XUE J H,et al.Features of pipe transportation of paste-like backfilling in deep mine[J].Journal of Central South University of Technology,2011,18(5):1413-1417.
[12] 南世卿,胡树军,胡亚军.石人沟铁矿充填管道布置方案优化研究[J].矿业研究与开发,2014,34(3):25-28.
[13] 王海瑞.全尾砂胶结充填自流输送管路改造及优化[D].长沙:中南大学,2010.
[14] 罗欢.东乡铜矿深部胶结充填系统输送参数优化研究[D].赣州:江西理工大学,2011.
[15] 聂文波,李凤义,陈雷.桃山矿胶结充填管道输送系统充填试验[J].金属矿山,2014,(9):35-38.
[16] 羊羽翔,付建新,宋卫东.充填管道布置方案优化中的数值模拟分析[J].黄金,2014,35(8):37-40.
[17] 周旭,王佩勋.大倍线管道自流输送胶结充填技术[J].金属矿山,2011,(8):25-28.
[18] 陶平凯.基于ANSYS FLOTRAN的管道输送参数优化[J].金属矿山,2012,(11):43-45.
[19] 马黎明.黄沙坪深部胶结充填管输系统优化研究[D].长沙:中南大学,2012.
[20] 费俊祥.浆体与粒状物料输送水力学[M].北京:清华大学出版社,1992:22-56.

Outlines

/