img

Wechat

  • CN 62-1112/TF 
  • ISSN 1005-2518 
  • Founded in 1988
Adv. Search

Optimization of Filling System for a Gold Mine

  • DING Wenjun ,
  • LI Guanghui ,
  • DING Zhihao
Expand
  • 1.Canzhuang Gold Mine,Zhaojin Mining Industry Co.,Ltd.,Zhaoyuan    265402,Shandong,China;
    2.Yantai Special Equipment Inspection and Research Institute,Yantai    265508,Shandong,China

Received date: 2016-07-05

  Revised date: 2016-07-25

  Online published: 2016-11-17

Abstract

Applying the existing venues as well as facilities,by reasonable planning,construction scheme and optimization of construction sequence,the original horizontal filling station was optimized to be the type of vertical filling station.With this improvement and modification,various issues and disadvantages such as the outdated equipment of original filling station,backward technology,no guarantee for the quality of the filling pulp as well as mining-filling imbalance were solved.After modification of the filling system optimization, the achieved significant results are summarized as follows:(1)a new filling station presented advantage of big sand reserves,good mud making effect,thus gold production capacity was greatly improved;(2)the optimized system was a high degree of automation,simple operation and less laborious;(3)the new system also showed running stability,controllable operation,accurate static and dynamic measurement,stable slurry concentration; (4)the cost of filling was significantly reduced and economic efficiency of enterprises was improved.Practice operation demonstrated that the filling system needs less investment with good benefits.Therefore,it provides a valuable reference and experience for similar mines.

Cite this article

DING Wenjun , LI Guanghui , DING Zhihao . Optimization of Filling System for a Gold Mine[J]. Gold Science and Technology, 2016 , 24(4) : 87 -91 . DOI: 10.11872/j.issn.1005-2518.2016.04.087

References

[1] 冯巨恩,金属矿深井充填系统的安全评价与失效控制方法研究[D].长沙:中南大学,2005.
[2] 杨纪光,王海涛,刘文忠.多矿区充填系统整合提效生产模式在焦家金矿的应用[J].黄金科学技术,2013,22(2):69-72.
[3] 钟豫.金属地下矿山井下移动式充填系统的应用研究[D].昆明:昆明理工大学,2013.
[4] 王石,张钦礼,王新民.SD在金川龙首矿充填系统稳定性预测中的应用[J].中国安全科学学报,2014,24(9):159-165.
[5] 施士虎,李浩宇,陈慧泉.矿山充填技术的创新与发展[J].中国矿山工程,2010,39(5):10-13.
[6] 江英海.旋流器用于胶结充填工艺的研究与应用[J].现代矿业,2010(7):118,134.
[7] 刘培坤,王书礼,王显军.水力旋流器在金矿尾矿处理中的应用[J].黄金,2005,26(2):31-33.
[8] 朱岳新.尾砂充填系统造浆装置的改造[J].新疆有色金属,2010,33(1):40,43.
[9] 朱天平.白银公司深部铜矿尾砂胶结充填系统[J].有色金属,2002,54(1):95-97.
[10]周爱民,鲍爱华.中国充填技术概述[C]//第八届国际充填采矿会议论文集.北京:中国有色金属学会,2004:1-7.
[11]王方汉,姚中亮,曹为勤.金尾砂结构流体胶结充填的理论与实践[C]//第五届中国充填采矿技术与装备大会论文集.长沙:长沙矿山研究院,2011:67-70.
[12]崔刚.充填模拟系统及其自动控制初步方案[J].中国矿业,2001,10(5):34-36.

Outlines

/