[an error occurred while processing this directive]
全磷废料高浓度充填两相流环管试验研究
刘冰1,2,李夕兵1,2
Study on Two-phase Flow Loop Test of High Concentration Backfill with Total Phosphorus Waste
Bing LIU1,2,Xibing LI1,2

图4. 磷石膏充填料浆环管试验装置

Fig.4. Loop test devices of phosphorusgypsum backfill slurry