多层缓倾薄矿群竖井位置的三维协同设计 |
陈庆发,肖体群,高远 |
3D Co-Design of Shaft Position in Multi-layer Gently Inclined Thin Ore Group |
Qingfa CHEN,Tiqun XIAO,Yuan GAO |
图4 方案Ⅲ开拓方案图 1-东副井;2-3号盲斜井;3-4号盲斜井;4-主井(混合井);5-风井;6-副井;7-30 m水平巷道;8-90 m水平巷道;9-255 m水平巷道 |
Fig.4 Development scheme diagram of scheme Ⅲ |