基于关键链的地下矿采掘计划编制优化方法
谭正华,文阳,王李管,李国泰

Optimization Method for Preparation of Underground Mining Plan Based on Critical Chain
Zhenghua TAN,Yang WEN,Liguan WANG,Guotai LI
表1 三贵口矿山530中段采掘计划衔接表
Table 1 Connection table for mining plan in 530 middle section of Sanguikou mine
行号采场序号采场编号工序序号开始时间结束时间所需资源后继采场序号
057530-5203(9-3,9)KC12020/4/82020/4/14358、59
22020/4/152020/4/183
158530-5202(9-3,9)KC12020/4/152020/4/21360
22020/4/222020/4/272
259530-5204(9-3,9)KC12020/4/152020/4/212Null
22020/4/222020/4/272
360530-5201(9-3,9)KC12020/4/222020/4/28461
22020/4/292020/5/23
461530-5204(9)KC12020/4/222020/4/27362
22020/4/282020/5/32
562530-5206(9)KC12020/4/282020/5/3265
22020/5/42020/5/72
663530-5207(9)KC12020/4/82020/4/13164
22020/4/142020/4/193
764530-5208(9)KC12020/4/142020/4/19265
22020/4/202020/4/252
865530-5209(9)KC12020/5/42020/5/9266
22020/5/102020/5/203
966530-5210(9)KC12020/5/102020/5/15467
22020/5/162020/5/224
1067530-5802(9-3,9)KC12020/5/162020/5/204Null
22020/5/212020/5/292
1168530-5803(9-3,9)KC12020/4/82020/4/19269
22020/4/202020/4/262
1269530-5803(9-3,9)KC12020/4/202020/5/3270、71
22020/5/42020/5/94
1370530-5804(9-3,9)KC12020/5/42020/5/12272
22020/5/132020/5/222
1471530-5805(9-3,9)KC12020/5/42020/5/113Null
22020/5/122020/5/173
1572530-6001(9)KC12020/5/232020/5/27373
22020/5/282020/6/32
1673530-6002(9)KC12020/5/292020/6/52Null
22020/6/62020/6/101