基于NSGA-Ⅱ算法的废石及尾砂混合充填料配比优化
高峰,艾浩泉,梁耀东,罗增武,熊信,周科平,杨根

Optimization of Proportioning of Waste Rock and Tailings Mixed Filling Materials Based on NSGA-II Algorithm
Feng GAO,Haoquan AI,Yaodong LIANG,Zengwu LUO,Xin XIONG,Keping ZHOU,Gen YANG
表6 不同组号的材料成本预算
Table 6 Cost budget of different group numbers
组号成本/(元/吨)组号成本/(元/吨)
1129.376120.38
2127.667120.80
3124.068121.58
4130.299123.34
5125.8410128.31