三维激光扫描在隧洞围岩结构信息获取中的应用研究 |
||||||||||||||||||||||||||||
张浩,卿黎,邱士利,寇永渊,郭赟林,夏胜衍 | ||||||||||||||||||||||||||||
Application of Three-dimensional Laser Scanning in Extracting Rock Mass Structure Information of Tunnel |
||||||||||||||||||||||||||||
Hao ZHANG,Li QING,Shili QIU,Yongyuan KOU,Yunlin GUO,Shengyan XIA | ||||||||||||||||||||||||||||
表2 +650 m水平卸载站硐室工程区混合岩地层发育的优势结构面组地质测量与利用校核算法计算产状和间距汇总 |
||||||||||||||||||||||||||||
Table 2 Summary of geological measurement of the dominant structural plane group developed in the mixed rock strata in the chamber engineering area of the +650 m level unloading station and the calculation of the occurrence and spacing by the calibration algorithm |
||||||||||||||||||||||||||||
|
||||||||||||||||||||||||||||