三维激光扫描在隧洞围岩结构信息获取中的应用研究 |
||||||||||||||||||||||||||||
张浩,卿黎,邱士利,寇永渊,郭赟林,夏胜衍 | ||||||||||||||||||||||||||||
Application of Three-dimensional Laser Scanning in Extracting Rock Mass Structure Information of Tunnel |
||||||||||||||||||||||||||||
Hao ZHANG,Li QING,Shili QIU,Yongyuan KOU,Yunlin GUO,Shengyan XIA | ||||||||||||||||||||||||||||
表3 +650 m水平卸载站硐室工程区混合岩地层发育的优势结构面组提取与地测结果差值及利用校核算法计算产状差值比较 |
||||||||||||||||||||||||||||
Table 3 Comparison of difference between the extraction of the dominant structural plane group developed in the mixed rock strata in the chamber engineering area of the +650 m level unloading station and the geological survey results and attitude difference calculated by the calibration algorithm |
||||||||||||||||||||||||||||
|
||||||||||||||||||||||||||||