基于效果—效率的金矿绿色矿山建设综合评价研究
|
杨玮,邓博,龙涛,邓莎,薛梦鸽,方楠
|
Comprehensive Evaluation of Green Mine Construction of Gold Mine Based on Effect-Efficiency
|
Wei YANG,Bo DENG,Tao LONG,Sha DENG,Mengge XUE,Nan FANG
|
|
表8 2017—2021年陕西省10家黄金矿山绿色矿山建设效果评价结果
|
Table 8 Evaluation results of green mine construction effect of ten gold mines in Shaanxi Province from 2017 to 2021
|
|
黄金矿山企业编号 | 2017 | 2018 | 2019 | 2020 | 2021 | 5年平均值 |
---|
平均值 | 0.725 | 0.741 | 0.756 | 0.781 | 0.790 | 0.759 | M1 | 0.736 | 0.756 | 0.773 | 0.801 | 0.802 | 0.774 | M2 | 0.715 | 0.724 | 0.733 | 0.754 | 0.758 | 0.737 | M3 | 0.733 | 0.743 | 0.758 | 0.803 | 0.807 | 0.769 | M4 | 0.758 | 0.764 | 0.774 | 0.801 | 0.805 | 0.780 | M5 | 0.771 | 0.784 | 0.775 | 0.802 | 0.804 | 0.787 | M6 | 0.722 | 0.747 | 0.773 | 0.790 | 0.808 | 0.768 | M7 | 0.723 | 0.738 | 0.759 | 0.784 | 0.800 | 0.761 | M8 | 0.698 | 0.711 | 0.733 | 0.749 | 0.764 | 0.731 | M9 | 0.692 | 0.717 | 0.738 | 0.765 | 0.780 | 0.738 | M10 | 0.705 | 0.728 | 0.746 | 0.765 | 0.772 | 0.743 |
|
|
|