超大断面扁平结构隧道施工参数优化研究
刘宽,莫冠旺,李响,沈平欢,万波,刘建坤

Optimization of the Construction Parameters of Super-large Section Flat Structure Tunnel
Kuan LIU,Guanwang MO,Xiang LI,Pinghuan SHEN,Bo WAN,Jiankun LIU
表7 不同观测断面观测点1的竖向位移值
Table 7 Vertical displacement values of monitoring point 1 at different monitoring sections(mm)
桩号1.0 m锚杆纵距1.5 m锚杆纵距2.0 m锚杆纵距
ZK6+790-4.246-4.256-4.246
ZK6+800-4.291-4.297-4.293
ZK6+810-4.412-4.415-4.414
ZK6+820-4.552-4.555-4.557
ZK6+830-4.687-4.686-4.687
ZK6+840-4.734-4.731-4.726
ZK6+850-4.691-4.692-4.702
YK6+810-3.749-3.749-3.744
YK6+820-3.785-3.778-3.776
YK6+830-3.908-3.908-3.900
YK6+840-4.057-4.059-4.048
YK6+850-4.184-4.181-4.174
YK6+860-4.257-4.254-4.243
YK6+870-4.261-4.261-4.256