基于LM-LSO算法的磷石膏堆场边坡形态与稳定性智能优化方法
李垚熠,陈国庆,石明汉,周玉新,聂闻,郑成

Intelligent Optimization Method for Slope Morphology and Stability of Phos-phogypsum Stack Based on LM-LSO Algorithm
Yaoyi LI,Guoqing CHEN,Minghan SHI,Yuxin ZHOU,Wen NIE,Cheng ZHENG
表3 挖方量计算结果
Table 3 Calculation results of excavation volume(m2
方案不同台阶坡面角下挖方量
20°21°22°23°24°25°26°27°28°29°
(2,5)602.2495.9400.8313.1232.8158.3----
(3,5)728.4624.2528.6441.4360.6286.4217.1153.0--
(4,5)856.5752.3657.0569.5489.2414.5345.4281.1221.1164.8
(2,6)551.9447.5352.2264.7184.2-----
(3,6)655.8551.3456.0368.5288.0213.5----
(4,6)759.6655.1559.8472.3391.8317.3248.2183.9--
(2,7)517.4413.0312.6230.1149.6-----
(3,7)603.9499.4404.1316.6236.1161.6----
(4,7)690.4585.9490.6403.1322.6248.3179.0---
(2,8)490.8386.3291.0203.5------
(3,8)564.0459.5364.2277.0196.2-----
(4,8)637.2532.7437.4350.0269.4194.9----